[0065] like figure 1 As shown, this embodiment provides a method for optimal configuration of energy-efficient power plants and coordinated planning of power plants based on the uncertainty method, the method includes the following steps:
[0066] S1 According to the two-level programming theory and the constraints of transmission network planning, establish a two-level planning model for the transmission network considering energy efficiency power plants, and consider the upper model of the plant-network coordination planning model for energy efficiency power plants. Line investment cost, power plant (conventional power plant, EPP, wind farm and photovoltaic power plant) investment and operation cost, and load shedding penalty cost; the lower-level planning model takes the minimum investment cost of the power plant as the objective function, including the construction cost of new conventional power plants and the construction of new energy-efficient power plants Cost, new pho...