Distributed anti-clogging abdominal cavity hyperthermal perfusion drainage tube
An anti-clogging, hot perfusion technology, applied in catheters, suction and irrigation systems, suction devices, etc., can solve the problems of drainage tube disconnection, drainage tube blockage, non-conformity, etc., to prevent drainage tube clogging, smooth drainage, and avoid clogging. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036]Embodiment 1, a decentralized anti-clogging peritoneal hyperthermic perfusion drainage tube, including a double-lumen catheter 2 placed on the left and right under the abdominal diaphragm, and a double-lumen catheter 2 on the left and right of the pelvic floor. The double-lumen catheter 2 has a drainage cavity 21, a flushing cavity 22, the end of the double-lumen catheter 2 is tapered and closed into a smooth bullet 24, and a flushing port 25 communicating with the branch flushing cavity 22 is opened on the bullet 24; The double-lumen catheter 2 is provided with two opposite drainage ports 26 communicating with the drainage chamber 21; it also includes a main catheter 1, and the upper ends of the four double-lumen catheters 2 and the lower end of the main pipe 1 are in the shape of a "cross" Distributed and connected as a whole, the main pipe 1 is provided with four main flushing chambers 11 uniformly distributed around its center of circle, four main drainage chambers 12...
Embodiment 2
[0041] Embodiment 2, others are the same as Embodiment 1, the difference is that the tube wall of the main pipe 1 includes the inner layer 202 that opens the main flushing chamber 11 and the main drainage chamber 12, and the latex that is combined with the inner layer 202 The outer layer 201, the center of the inner layer 202 is also provided with an inflatable chamber 13, and the upper end of the main pipe 1 is also provided with an inflatable joint 16 communicating with the inflatable chamber 13, and a self-sealing valve 17 is arranged in the inflatable joint 16. A section of latex inner layer 202' near the lower end of the main pipe 1 is not combined with a section of latex outer layer 201' but is separated from each other to form a gap. On this section of latex inner layer 202', a section communicating with the gas-filled cavity 13 and avoiding Open the air outlet chamber 17 of the main flushing chamber 11 and the main drainage chamber 12, and the air outlet chamber 17 is o...
PUM
Property | Measurement | Unit |
---|---|---|
Outer diameter | aaaaa | aaaaa |
Outer diameter | aaaaa | aaaaa |
Long trail | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com