[0041] Embodiment 1: A kind of chimney multi-tube cluster titanium steel inner tube hydraulic steel strand lifting and flipping construction method, such as figure 1 As shown, taking the installation of three titanium steel inner cylinders 2 in a chimney 1 with a height of 210 meters as an example, the following steps are included.
[0042] Such as figure 1 with figure 2 As shown, step S1: install steel platforms 3 from top to bottom in the chimney 1 with heights of 201 meters, 165 meters, 127 meters, 87 meters, 48 meters, and 33 meters, and three steel platforms 3 are formed on the steel platform 3. Circumferential distribution and make three titanium steel inner tubes 2 pass through the mounting holes 32;
[0043] Step S2: Install a hydraulic lifting jack 31 on the steel platform 3 at a height of 201 meters, and four hydraulic lifting jacks 31 are installed on the steel platform 3 on the peripheral side of each installation hole 32 to lift the same titanium steel inner ...