Method for solving sticking in plug drilling of shale gas long horizontal well coiled tubing
A long-horizontal well and shale gas technology, applied in earth-moving drilling, wellbore/well components, etc., can solve the problems of complex wellbore trajectory bending, aggravating coiled tubing bending deformation, and encountering sticking, etc., to improve the success of unblocking rate, and the effect of reducing the risk of encountering cards
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0034] Example 1: Bridge plug debris sticking
[0035] Example 1: The circulation channel was unblocked during the drilling of the plug, but it was blocked when the coiled tubing was lowered. It was preliminarily judged that the bridge plug debris was stuck, and the following methods were used to remove the jam: (1) Try to use method 1 to alternately inject 40-50mPa· s linear glue and 6-9mPa·s drag-reducing water were used to circulate and unblock without success. (2) Try to use the method 2 to remove the jam, and repeatedly lift and lower the movable string within the range of about ±8 tons. (3) When method 1 and method 2 cannot release the jamming, use method 3 to pump metal drag reducer to cover the entire horizontal section, reduce the friction force of the coiled tubing and the stuck place, and cooperate with method 2 to lift the tube The column is successfully unstuck.
Embodiment 2
[0036] Example 2: Downhole accumulation deposit buried pipe
[0037] Example 2 In the process of lifting the plug in the middle section of the drilling process, no attention was paid to the lack of exit at the wellhead, and the operation was not carried out in accordance with the standard operating procedures. Blind lifting resulted in jamming. The following methods were used to remove the jamming: (1) First, try to use method 2 to move the solution The card method, repeatedly lifting and lowering within the range of about ±8 tons, the lifting force gradually increased to the limit of 80% of the tensile strength, and intermittently tried Method 1 to establish a circulation channel without success. (2) If method 2 cannot be used to release the jam, try to use method 4 to release the jam, activate the coiled tubing downhole jar tool, use the principle of the jar to amplify the pulling force to try to release the jam, and try method 1 intermittently to establish loop channel. (3...
Embodiment 3
[0038] Example 3: The deformation of the casing causes the tool to be stuck
[0039] Example 3: In the process of plug drilling, repeated jamming and resistance were encountered, and the following methods were used to solve the jamming: (1) First, use method 1 to alternately pump 40-50mPa·s linear glue and 6-9mPa·s drag-reducing water for circulation Release the stuck, and return the bridge plug debris and wellbore grit to the wellhead. (2) According to the returning situation of the debris, try to use the method 2 to remove the sticking method, repeatedly lifting and lowering within the range of about ±8 tons, and the lifting force gradually increases to the limit of 80% of the tensile strength. (3) When method 1 and method 2 cannot be used to remove the stuck, try to use the method 3 to reduce the drag and remove the stuck, pump the metal drag reducer to cover the entire horizontal section, reduce the friction of the coiled tubing and the stuck place, and at the same time C...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com