Engineering management construction-side task interaction management method and device

A technology of project management and management methods, which is applied in the field of interactive management of construction party tasks in project management, and can solve problems such as unfavorable assessors and inability to meet project management

Inactive Publication Date: 2018-03-09
北京地厚云图科技有限公司
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing work tasks are tracked without process, which is not conducive to the assessment personnel, nor can it meet the needs of the current complex project management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering management construction-side task interaction management method and device
  • Engineering management construction-side task interaction management method and device
  • Engineering management construction-side task interaction management method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] figure 1 It is a flow chart showing the interaction management method of the builder task according to Embodiment 1 of the present application.

[0026] refer to figure 1 , in step S110, the expert defines the work tasks of the construction party, and quantifies the work tasks of the construction party.

[0027] Experts define the work tasks of the construction party. Specifically, after the project is established and allocated, the work tasks of the construction party are divided. The types of division include but are not limited to pre-construction reporting, actual measurement and measurement, financial management, and house delivery management. In order to improve generality, it is also possible to customize the type of work tasks of the construction party. On the basis of determining the types of work tasks of the construction party, the work tasks of the construction party can be further divided and refined according to the specific content of the work tasks of ...

Embodiment 2

[0050] Based on the same technical idea, image 3 It is a logical block diagram showing an interaction management device for construction party tasks in project management according to Embodiment 2 of the present application. It can be used to execute the flow of the interactive management method for the task of the construction party in the project management as described in the first embodiment.

[0051] refer to image 3 , the interactive management device for construction party tasks in project management includes: a quantification module 310 , an assignment module 320 , an execution module 330 and a confirmation module 340 .

[0052] The quantification module is used for experts to define the work tasks of the construction party and quantify the work tasks of the construction party;

[0053] An assignment module, used for assigning people to assign quantified work tasks, and the assigned work tasks are categorized;

[0054] The execution module is used for the person i...

Embodiment 3

[0073] image 3 It is a schematic structural diagram showing a device according to Embodiment 3 of the present application, and the specific embodiment of the present application does not limit the specific implementation of the device 400 . Such as image 3 As shown, the device 400 may include:

[0074] A processor (processor) 410 , a communication interface (Communications Interface) 420 , a memory (memory) 430 , and a communication bus 440 . in:

[0075] The processor 410 , the communication interface 420 , and the memory 430 communicate with each other through the communication bus 440 .

[0076] The communication interface 420 is used for communicating with network elements such as clients.

[0077] The processor 410 is configured to execute the program 432, and may specifically execute relevant steps in the foregoing method embodiments.

[0078] Specifically, the program 432 may include program codes including computer operation instructions.

[0079] The processor...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an engineering management construction-side task interaction management method and device. The method comprises steps that construction-side work tasks are quantified by the expert; the quantified work tasks are assigned by an assigner, and the assigned work tasks are classified; the quantified work tasks are performed by responsible persons; result confirmation of the result of the completed work tasks is performed by the assigner; If the result is confirmed to pass, data of the work tasks is stored, and the data of the work tasks can be subsequently queried; if the result is confirmed to fail, the work tasks are re-modified or re-performed by the responsible persons. The method is advantaged in that effective process control of the quantified task system is facilitated, whole task process management is focused, each stage of the work tasks can be effectively managed, moreover, after the tasks are assigned, the tasks are classified, each step of the work tasks is tracked and controlled, and subsequent work task result tracing is guaranteed.

Description

technical field [0001] The present application relates to the field of data processing, in particular to a method and device for interactive management of construction party tasks in project management. Background technique [0002] With the development of the construction field, project management is also paying more and more attention to the development of project management information. Existing project management is generally result-oriented and is a traditional OA management model. The existing work tasks are all without process tracking, which is not conducive to the assessment personnel, nor can it meet the needs of the current complex project management. In project management, the construction party often needs to conduct timely and effective process management for a large number of work tasks, not just limited to OA management of work results. Contents of the invention [0003] The first aspect of the present application is to provide an interactive management m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/06311G06Q10/103G06Q50/08
Inventor 谢远玉薛奇辉单立新肖发权卢一平徐福兵陈小东
Owner 北京地厚云图科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products