A greening method for barren slopes in heavy saline soil in arid areas
An arid area, heavy salt technology, applied in the field of heavy salt soil barren slope greening in arid areas, can solve the problems of high water consumption, soil erosion on barren slopes, and repeated problems.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] In mid-April 2016, a 300m-long test demonstration was carried out on the barren slope road section of heavy saline soil in Ganquanbao Economic and Technological Development Zone, Urumqi:
[0027] a. Select the barren slope of heavy saline soil with a slope of 5-25°, soil salt content of 2%, and barren site conditions. On the basis of the original terrain, adopt a partial site preparation method of cutting high and filling low, and use a small bulldozer to clean up the surface of the slope top 1 , the raised ones are flattened, the pits are filled and trimmed, and the slope top 1 maintains a 0.3% reverse slope; then the slope surface 2 is sorted out, the side slope is cleaned, and the depression is filled to make the slope surface 2 level;
[0028] B, open the planting ditch: open the horizontal planting ditch 3 along the contour line with a ditching machine from the top to the bottom of the slope surface 2, cultivate the ridge with the ditch soil, the inner low and the o...
Embodiment 2
[0043] In May 2017, a 500m-long test section of heavy saline soil barren slope greening was carried out on the road section of Shenhua Group Co., Ltd. in Ganquanbao Economic and Technological Development Zone, Urumqi:
[0044] Barren slope finishing:
[0045] a. Select the site conditions of heavy saline soil barren slope with a slope of 5-25°, soil salt content of 2.5%, barrenness, and heavy soil erosion. The surface of the top 1 is cleaned up, the protrusions are flattened, the pits are filled and repaired, and the slope top 1 maintains a 0.3% reverse slope; then the slope 2 is cleaned up, the side slope is cleaned, and the depression is filled to make the slope 2 flat ;
[0046] B, open the planting ditch: open the horizontal planting ditch 3 along the contour line with the ditching machine from the top to the bottom of the slope surface 2, cultivate the ridge with the ditch soil, form the anti-slope ditch with the inner low and the outer high, the outer ridge is 15cm high...