Prefabricated steel structure equipment pit and construction method thereof
A construction method and steel structure technology, applied in the direction of building structure, construction, etc., can solve the problems of pit construction where equipment pits are not easy to support formwork, and achieve the effects of reducing construction costs, saving construction period, and convenient construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Combine below Figure 1 to Figure 3 The structural composition of the prefabricated steel structure equipment pit of the present invention is described in detail.
[0030] Please refer to Figure 1 to Figure 3 , A prefabricated steel structure equipment pit, which includes an integrally formed hollow square metal box body 10, 0 metal box body 10 and the concrete structure floor 3 sinking reserved hole matching, the reserved hole around the concrete structure floor 3 There is an angle steel 5 at the edge, and the right-angle side of the angle steel 5 is clamped and connected with the edge of the concrete structure floor 3, the open end of the metal box 10 is provided with a cornice outer flange 1, and the side and bottom of the metal box 10 are respectively provided with a number of through holes 2. The outer flange 1 of the cornice is laid on the angle steel 5 so that the metal box body 10 is embedded and fixed in the reserved hole of the concrete structure floor 3. Of c...
Embodiment 2
[0040] Please continue to refer Figure 1 to Figure 3 , The present invention also provides a construction method of a prefabricated steel structure equipment pit, the construction method includes the following steps:
[0041] Step 1. The factory integrates the production of the aforementioned prefabricated steel structure equipment pits. The concrete structure building, 3 reserves holes during the construction, and the reserved holes are matched with the prefabricated steel structure equipment pits;
[0042] Step 2: Hoist the prefabricated steel structure equipment pit to the reserved hole, and clamp the angle steel 5 at the edge of the concrete structure floor 3 around the reserved hole opening, and fold the edge of the cornice of the prefabricated steel structure equipment pit metal box 10 1 is erected on the angle steel 5, so that the prefabricated steel structure equipment pit is embedded and fixed in the reserved hole of the concrete structure floor 3.
[0043] In this embodim...