Preparation method of road paving material for city slow-traffic system
A pavement material and road technology, which is applied in the field of preparation of road pavement materials in urban slow traffic system, can solve the problem of aggravated separation of employment and residential areas and pendulum traffic, can not realize the absorption of visible light and self-luminescence, and does not fully consider pedestrians Demand and other issues, to achieve good water stability, road performance improvement, cost-saving effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0057] According to an embodiment of the preparation method of urban slow traffic system road pavement material of the present invention, adopt the mode of cold mixing, comprise the following steps according to sequence:
[0058] Step 1: Mix pebbles with a particle size of 1.05 cm and self-luminous stones in the shape of polyhedral particles with a particle size of 1.05 cm, and stir;
[0059] Step 2: adding lignin and titanium dioxide to the mixture in step 1, and stirring;
[0060] Step 3: Mix pebbles with a particle size of 0.55 cm, self-luminous stones in the shape of polyhedral particles with a particle size of 0.85 cm, and self-luminous stones in the shape of round particles with a particle size of 0.35 cm, and stir;
[0061] Step 4: adding lignin and titanium dioxide to the mixture in step 3, stirring;
[0062] Step 5: Mix pebbles with a particle size of 0.3 cm, self-luminous stones in the shape of polyhedral particles with a particle size of 0.5 cm, and self-luminous s...
Embodiment 2
[0083] According to another embodiment of the preparation method of urban slow traffic system road pavement material of the present invention, its process steps, principle, beneficial effect etc. are all the same as embodiment one, the difference is: in step one, the particle diameter of cobblestone is 1.2cm, the particle size of the polyhedral particle-shaped self-luminous stone is 1.2cm; in step 3, the particle size of the pebble is 1.0cm, and the particle The particle size of the stone is 0.48cm; in step 5, the particle size of the pebble is 0.5cm, the particle size of the self-luminous stone in the shape of polyhedron particles is 0.8cm; the particle size of the self-luminous stone in the shape of round particles is 0.3cm. In steps 1 to 6, the mixing time of the mixture is 10s; in step 7, the mixing time of the mixture is 60s. During the whole preparation process of the pavement material, the total stirring time is 120s.
[0084] The pavement material prepared by the prep...
Embodiment 3
[0087] According to another embodiment of the preparation method of urban slow traffic system road pavement material of the present invention, its process steps, principle, beneficial effect etc. are all the same as embodiment one, the difference is: in step one, the particle diameter of cobblestone is 1.1cm, the particle size of the polyhedral particle-shaped self-luminous stone is 1.1cm; in step 3, the particle size of the pebble is 0.8cm, and the particle size of the polyhedral particle-shaped self-luminous stone is 0.9cm; The particle size of the stone is 0.4cm; in step 5, the particle size of the pebble is 0.4cm, the particle size of the self-luminous stone in the shape of polyhedron particles is 0.6cm; the particle size of the self-luminous stone in the shape of round particles is 0.2cm. In steps 1 to 6, the mixing time of the mixture is 10s; in step 7, the mixing time of the mixture is 50s. During the whole preparation process of the pavement material, the total stirrin...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More