A reverse osmosis process for impregnating asphalt
A technology of reverse osmosis and asphalt, applied in the direction of pretreatment surface, device for coating liquid on the surface, coating, etc., can solve problems such as low quality of impregnated parts, achieve shrinkage and internal and external temperature difference, ensure impregnation quality, and realize consistent effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] A reverse osmosis process for impregnating bitumen, comprising the following steps:
[0032] (a) Asphalt extraction; heat the closed impregnation tank containing the product to be impregnated, heat up to 220-280°C, pressurize it to 20-25bar and maintain the pressure. After maintaining the pressure for a period of time, the Extract the remaining liquid asphalt in the impregnation tank; make the asphalt liquid at a temperature of 220-280°C, and impregnate the product to be impregnated in a closed environment with a pressure of 20-25bar. The pressure-holding and impregnation time is 10-23h, and the impregnation is completed Finally, the asphalt is extracted from the impregnation tank through an external pump, the purpose of which is to avoid the waste of asphalt caused by the solidification of excess asphalt at room temperature during the process of transferring the impregnated product to the next station;
[0033] (b) keeping the pressure and lowering the temperature, whi...
Embodiment 2
[0037] The inventor believes that in order to more clearly describe the technical solution disclosed in the present invention, according to the accompanying drawings figure 1 A reverse osmosis process for impregnating asphalt in this example is described.
[0038] A reverse osmosis process for impregnating bitumen, comprising the following steps:
[0039] (a) Asphalt extraction; heat the closed impregnation tank containing the product to be impregnated, heat up to 220-280°C, pressurize it to 20-25bar and maintain the pressure. After maintaining the pressure for a period of time, the Extract the remaining liquid asphalt in the impregnation tank; make the asphalt liquid at a temperature of 220-280°C, and impregnate the product to be impregnated in a closed environment with a pressure of 20-25bar. The pressure-holding and impregnation time is 10-23h, and the impregnation is completed Finally, the asphalt is extracted from the impregnation tank through an external pump, the purpo...
Embodiment 3
[0053] In order to further describe the technical solution disclosed in the present invention, as Figure 2-6 Shown, primary cooling system among the present invention comprises and comprises dipping tank 1, also comprises:
[0054] A drainage mechanism 2, the drainage mechanism 2 includes a drainage assembly A21 and a drainage assembly B22 communicating with the inside of the dipping tank 1, and the hot gas in the dipping tank 1 is transported through the drainage assembly A21 to The airflow generator 23 in the drainage assembly B22, the said drainage assembly B22 is communicated with the interior of the dipping tank 1; in this embodiment, the hot gas flow is a mixture of nitrogen and the gas generated during the dipping process;
[0055] The cooling mechanism 3, the cooling mechanism 3 includes a heat conduction component 31 arranged on the drainage component B22 to cool down the hot air flow in the drainage component B22 by means of heat transfer, and a heat conduction comp...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


