Method for eliminating outburst in advance for hard roof of coal mine in full face roadway

A hard roof and working face technology, applied in ground mining, earthwork drilling, underground mining, etc., can solve the problems of the deep part of the working face, the problem of outburst elimination in the working face, and the high cost of drilling.

Inactive Publication Date: 2018-11-20
王一帆
View PDF10 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The blasting roof control technology has the following defects: a large amount of pyrotechnics is used, and there are potential safety hazards in the transportation process; a large amount of toxic and harmful gases are generated after use, which seriously threatens the life safety of the workers and increases the probability of workers suffering from occupational diseases; The vibration generated by the roof will damage the support of the working face and the ground
[0006] Although the directional hydraulic fracturing technology in the roadway can eliminate the outburst in advance, it still has the following defects: the footage length is invalid at the predetermined position of the hard roof, and it is necessary to drill inclined wells in the roadway; it is necessary to densely arrange wells on both sides of the roadway working face. High cost; during fracturing construction, a directional grooving process needs to be added before each fracturing, resulting in a prolonged construction period; single well footage is short, which cannot solve the deep problem of the working face, nor can it solve the outburst problem of the entire working face

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for eliminating outburst in advance for hard roof of coal mine in full face roadway
  • Method for eliminating outburst in advance for hard roof of coal mine in full face roadway
  • Method for eliminating outburst in advance for hard roof of coal mine in full face roadway

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0114] According to an embodiment of the method for eliminating sudden outbursts in advance in the roadway of the full working face of the hard roof of the coal mine of the present invention, it comprises the following steps in sequence:

[0115] Step 1: Design drilling parameters and fracturing construction parameters according to the data and data collected in the previous field construction; Step 2: Arrange a directional drilling machine at the beginning of the working face corresponding to the roadway on the side of the coal mine, and use the directional drilling machine to open holes upward at a certain angle The first horizontal well is drilled at the preset position of the hard top plate, and the horizontal section ends at a certain distance from the edge of the working face, and then the second horizontal well is drilled in the same way until the nth horizontal well, and the horizontal section of each horizontal well is equal to Open hole completion;

[0116] Step 3: A...

Embodiment 2

[0185] According to another embodiment of the method for eliminating outbursts in advance in the roadway of the coal mine hard roof full working face of the present invention, its process steps, design formulas, principles of drilling and construction parameters, construction equipment used, beneficial effects, etc. are all the same as those in Embodiment 1. Same, except:

[0186] The staged fracturing method of the open hole horizontal section is hydraulic jet staged fracturing. The main feature of this fracturing method is "hydraulic jetting", that is, the high-speed fluid generated by the hydraulic jetting head penetrates the rock to form holes, and then the annulus Water injection and rehydration, the fluid generates a pressure higher than the fracture pressure at the bottom of the hole, extending the hydraulic fracture. Fracturing string: tubing + safety joint + hydraulic jet + hydraulic packer + centralizer + guide shoe, first fracturing the deepest part of the horizonta...

Embodiment 3

[0198] According to another embodiment of the method for eliminating outbursts in advance in the roadway of the coal mine hard roof full working face of the present invention, its process steps, design formulas, principles of drilling and construction parameters, construction equipment used, beneficial effects, etc. are all the same as those in Embodiment 1. Same, except:

[0199] The staged fracturing method of the horizontal section of the open hole is a ball-sliding sleeve staged fracturing method. The main features of this fracturing method are "ball-sliding sleeves" and "immobile strings", that is, completion strings and fracturing strings are used. The split pipe strings are combined into one string and run together, and tools such as hanging packers, expandable open-hole packers, ball-pitching sleeves, differential pressure sleeves, and setting ball seats are used to run into the well. Fracturing string: hanging packer + open hole packer N + ball sliding sleeve N + divi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a method for eliminating outburst in advance for a hard roof of a coal mine in a full face roadway. The method comprises the following steps: designing drilling parameters andfracturing construction parameters according to information and data which are acquired from preliminary site construction; arranging a directed drill at a start end of a face corresponding to a roadway on one side or two sides, and drilling a plurality of horizontal wells at preset positions of the hard roof at the upper part in a certain aperture angle, wherein a horizontal section is ended atthe edge or the central axis of the face at a certain distance, and the horizontal sections of all the horizontal wells are subjected to open hole completion; arranging equipment required for sectional fracturing construction of the horizontal wells in a proper region in the underground roadway; performing sectional fracturing construction on the open hole horizontal sections of the horizontal wells to enable the hard roof of the whole face to be full of cracks, so as to fulfill the aim of eliminating the outburst in advance for the hard roof of the coal mine in the full face roadway. According to the method, multiple cracks can be overall manufactured on the same horizontal plane of the hard roof to destroy the structure of the roof of the whole face to eliminate the outburst in advance,and the overall effect is outstanding.

Description

technical field [0001] The invention belongs to the technical field of coal mine mining, and in particular relates to a method for early elimination of outbursts in a roadway on a full working face of a hard roof in a coal mine. Background technique [0002] In coal mining, if there is a hard roof, it will cause serious deformation of the rock mass, severe occurrence of advanced mine pressure, and rock burst and other disasters. The hard roof collapses suddenly when the overhang area is large after the coal seam is mined. Before the 1980s, some coal mines in my country usually used the knife pillar mining method to manage the hard roof. After a certain distance was mined, a certain area of ​​coal pillars were left in the goaf to support the roof. Using this method can basically ensure that the roof does not collapse during the mining of the working face. However, with the continuous expansion of the mining area, the stress of the remaining coal pillars will gradually increa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21C41/18
CPCE21C41/18
Inventor 王一帆王衍马俯波
Owner 王一帆
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products