The present invention belongs to the technical field of
underwater operations, and specifically relates to an
underwater jet trenching and cable laying operation
system and operation method, wherein an
underwater walking device is arranged at the lower end of a
fuselage body; two jet arms are located at the front end of the
fuselage body; a jet suction device is arranged at the rear end of the
fuselage body, including a suction pipeline and a jet
pipe 2, the suction pipeline is used to suck the
silt in the trench through a suction port before the cable sinks to the bottom of the trench, and
discharge the
silt to the outside of the trench through a
discharge port; the jet
pipe 2 sprays a horizontal jet to flush the inner wall and bottom of the trench along the length direction of the trench, and maintains the trench shape of the trench when the cable sinks to the bottom of the trench. The present invention can be applied to a
seabed with sparse and soft soil, and in the case where the cable has a large bending
radius and can only sink naturally, it ensures that the cable is laid to the target depth to meet the operation requirements.