Rapid construction method of small light steel frame EPS module house
A construction method and technology of light steel, applied to roofs, building components, walls, etc., can solve the problems of high cost, long construction time, unsuitable construction in remote areas, etc., achieve convenient transportation, eliminate limited site, save pouring time and construction. cost effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0053] Further, see Figure 4 , as a specific embodiment of the rapid construction method for small light steel frame EPS modular houses provided by the present invention, after step H, it also includes:
[0054] H. Coating the first layer of anti-cracking mortar on the inner and outer surfaces of the wall formed by splicing EPS modules 21, pasting the grid cloth, coating the second layer of anti-cracking mortar, and making a decorative layer. Coating the anti-cracking mortar and pasting the grid cloth can isolate the EPS module 21 from contact with the air, and prevent the wall from cracking and the decorative layer from bulging and falling off caused by the aging of the EPS module 21 .
[0055] Further, see Figure 4 , as a specific embodiment of the rapid construction method for small light steel frame EPS modular houses provided by the present invention, the column 22 is a steel pipe, and before step E, it also includes the steps of preparing concrete and pouring concrete...
Embodiment approach
[0065] Further, see figure 1 , as a specific embodiment of the small light steel frame EPS module house provided by the present invention, the wall structure 20 includes a first wall with windows, a second wall with door openings and a second wall without windows and door openings. Among the three walls, the crossbeam 23 includes a first crossbeam arranged in the first wall and positioned at the lower edge of the window, a second crossbeam arranged in the first wall and positioned at the upper edge of the window, and a second crossbeam arranged in the second wall and positioned at the upper edge of the window. The third beam located on the upper edge of the door opening and the fourth beam evenly arranged in the third wall. According to the design and use requirements of the house, the wall structure 20 can be one or more of the first wall, the second wall and the third wall, and the beam 23 is arranged corresponding to the wall structure 20 .
[0066] Furthermore, please als...