Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

74results about How to "Speed up construction" patented technology

Self-adaptive calculation method for full-speed closely-attaching running control curve of rail transit train

The invention discloses a self-adaptive calculation method for a full-speed closely-attaching running control curve of a rail transit train. The method includes the following steps that a train running path and a train full-speed running reference curve are determined; a train traction running curve is calculated; the intersection sections of the train traction running curve and other reference curves are calculated; a train cruising running curve is calculated; the intersection sections of the train cruising running curve and other reference curves are calculated; a train braking running curve is calculated; the intersection sections of the train braking running curve and other reference curves are calculated; and in the train running direction, the train full-speed closely-attaching running control curve is generated. By the adoption of the method, a project task period can be greatly shortened, the project construction schedule is accelerated, and a large amount of expenditure is saved; and the use period of train-mounted system equipment is prolonged, the repair and maintenance workloads are reduced, the comprehensive design quality and level of a rail transit project are improved, and effective realization of the line transportation capacity is guaranteed.
Owner:SHANGHAI SHENTONG METRO +1

Method for regulating plant growth by using LED light source and LED plant illumination lamp

InactiveCN101990828APhotosynthesis efficientPhotosynthesis can be regulatedGreenhouse cultivationHorticulture methodsCommunication unitEngineering
The invention relates to the technical field of illumination lamp, particularly to a method for regulating plant growth by using LED light source and an LED plant illumination lamp, wherein the LED plant illumination lamp comprising an LED light source set, and LED control unit, an LED drive unit, a sampling and detecting unit, a communication unit and a power supplying power unit; the LED light source set is composed of two monochromatic LEDs, namely a green LED light source and a blue LED light source and auxiliary LED light sources. The method provided by the invention is used for scientifically and reasonably supplementing light to plant by using an LED light source which comprises green and blue two base colours and a plurality of auxiliary LED light sources according to the growth and development period of plant, photosynthetic principle, the principle for selectively absorbing spectrum wavelength and the different sensitivity of plant to the spectrum, so as to ensure the full photosynthesis of plant, improve the plant to such a degree that the leaves of the plant are fleshy, the roots are numerous and the growth is good, enhance the immunity and resistance of plant, promote precocious plant, improve the yield and improved the quality of fruit.
Owner:DONGGUAN WOOMI POWER TECH

Construction method of combined prefabricated bridge anti-collision wall

The invention discloses a construction method of a combined prefabricated bridge anti-collision wall. The method includes: using concrete to form a prefabricated outer side wall at a preset position by means of pouring; fixedly mounting the prefabricated outer side wall at the edge of a bridge wing plate; fixedly mounting an inner side formwork, with preset distance away from the prefabricated outer side wall, on the bridge wing plate; and pouring concrete between the prefabricated outer side wall and the inner side formwork to form an inner side wall. The inner part and the outer part of the anti-collision wall are constructed separately, the prefabricated outer side wall can be prefabricated in batches on a prefabricating site, and the inner side wall the formed by pouring on site. Due to the fact that the prefabricated outer side wall is used as an outer side formwork for pouring the inner side wall, no extra outer side formwork needs to be fixedly mounted, construction cost is lowered, and the construction procedure of outer side formwork mounting is omitted. In addition, only the inner side wall needs to be formed by pouring on site, workload of on-site concrete pouring is reduced, and engineering construction is accelerated. The construction method is applicable to the technical field of bridge engineering construction.
Owner:GUANGZHOU MUNICIPAL ENG DESIGN & RES INST CO LTD

Loosing-prevention bolt component with disassembling being controlled by preset torque

The invention discloses a loosing-prevention bolt component with disassembling being controlled by preset torque. The loosing-prevention bolt component comprises a nut, a bolt and a moving-stopping gasket which are matched with each other, wherein the nut is provided with ratchet structures, the bolt is provided with an axial groove, the moving-stopping gasket is provided with elastic pawls matched with the ratchet structures and a horizontal protrusion matched with the axial groove, and the horizontal protrusion is provided with a prefabricated nick. According to the loosing-prevention bolt component with the disassembling being controlled by the preset torque, by means of a matching manner that the number of ratchets of the ratchet structures differs by one from the number of the elastic pawls, the nut can be engaged and locked only needing a minimal rotating angle; the preset torque of the prefabricated nick can be set according to safety factors required by loosing prevention, the bolt component can perform the loosing prevention according to actual requirements and the required loosing-prevention accuracy, and the bolt loosing problem can be prevented and controlled; and when the unscrewing torque is larger than the preset torque, the nut can be disassembled.
Owner:广西国力新材料技术有限公司

Overground-underground bidirectional ultra-long concrete seamless design method

InactiveCN102433930AMeet the integrity requirements of the use functionIncrease the usable areaArtificial islandsBuilding constructionsOutdoor temperatureWater tightness
The invention discloses an overground-underground bidirectional ultra-long concrete seamless design method and belongs to the field of constructional engineering. The method is characterized in that home and abroad large finite element programs, such as ANSYS, ABAQUS, SAP2000 and PMSAP, are used for calculation and analysis, and indoor and outdoor temperature data actually measured in practical projects is applied in the calculation so as to actually measure the regional average temperature; the maximum temperature difference of concrete shrinkage is calculated; and the division of a post-pouring strip or an expansion reinforcing strip and the restrained expansion rate of the used crack resistant waterproofing agent and expanding agent are provided in the design according to the conditions of individual buildings. By utilizing the method, the problem of difficulty in overground-underground bidirectional ultra-long concrete seamless design is solved successfully, requirements on entire use functions of the buildings are satisfied, the usable area is increased, and simultaneously, the construction speed is accelerated; problems in aspects of durability, fire resistance, water tightness, maintenance and the like and building defects caused by arrangement of a deformation joint are solved; and the arrangement of equipment pipelines can be facilitated.
Owner:中国建筑东北设计研究院有限公司

Method for composite geo-membrane sloping core cofferdam

The invention discloses a method for a composite geo-membrane sloping core cofferdam. A buffer platform is reserved between an anti-seepage structure and a weir foot by moving a lower anti-seepage structure forwards, so that the synchronous construction of the lower anti-seepage structure and weir body filling is facilitated. A weir body comprises a weir body concrete extruding side wall, a weir body bedding material, a weir body transition material and a weir body rockfill material from upstream to downstream in sequence. The top of the lower anti-seepage structure is provided with anchoring concrete; the anchoring concrete is arranged after the weir top is filled to the top. The top and the bottom of a composite geo-membrane are provided with telescopic joints respectively and are anchored with the concrete at the weir top and the weir bottom respectively; the surface of the composite geo-membrane is protected by spraying the concrete. By using the method, conditions are created for parallel construction of the lower anti-seepage structure and the weir body filling, the weir body partition is simplified, the straight construction period is favorably shortened, the engineering construction progress is quickened, the engineering safety flood season is guaranteed, and the economic and social benefits are obvious.
Owner:SINOHYDRO BUREAU 14 CO LTD

Unlockable mortise and tenon joint self-locking type column-column connecting joint

The invention discloses an unlockable mortise and tenon joint self-locking type column-column connecting joint which is used for connecting an upper module unit and a lower module unit. The column-column connection mode can be applied to connection of corner module units, edge module units and middle module units. An inner box is welded to the upper end of a module column of the lower module unitthrough a connecting plate, and an outer box is welded to the lower end of the module column of the upper module unit. In the connecting process, tenons welded to an acting plates in the inner box canbe inserted into mortises formed in the outer box in advance under the thrust effect of a spring, and therefore column-column connection of the upper module unit and the lower module unit is completed. According to the self-locking type column-column connecting joint, reliable connection can be achieved only by inserting and attaching the upper module and the lower module at the corresponding positions, and extra connection operation is not needed. The unlockable mortise and tenon joint self-locking type column-column connecting joint can realize building industrialization, and has the advantages of accelerating the construction progress, saving energy, protecting the environment and the like.
Owner:DALIAN UNIV OF TECH

Casing pipe for pipe connection

The invention discloses a casing pipe for pipe connection. The casing pipe is designed to save pipe connecting time to the maximum degree and provide excellent support for pipe construction and operation. According to the casing pipe for pipe connection, the inner diameter of the casing pipe is equal to the outer diameters of pipes; a circumferentially assembled annular groove is formed in the inner circumferential surface of the casing pipe, and a rubber sealing ring and a compression steel ring are arranged in the groove; axial holes communicated with the circumferentially assembled annular groove are respectively formed in the two end faces of the casing pipe, a compression bolt is connected into each axial hole, and the tail portion of each compression bolt abuts against the compression steel ring; radial through holes are formed in the two ends of the outer circumferential surface of the casing pipe, a grasping bolt is connected into each radial through hole, and the rail portions of the grasping bolts abut against the outer circumferential surfaces of the pipes inserted into the casing pipe from the two ends of the casing pipe. According to the casing pipe for pipe connection, the interconnection between pipe sections is achieved through the casing pipe, fast connection of pipe connectors can be achieved, the joint difficulty is reduced, and the pipe connecting time can be saved to the maximum degree. The casing pipe for pipe connection is a beneficial means for quickening the pipe construction and operation. With the development of oil and gas pipeline construction, the device will play a more important role.
Owner:BC P INC CHINA NAT PETROLEUM CORP +1

Cavity assembly type tunnel inverted arch and construction method

The invention provides a cavity assembly type tunnel inverted arch and a construction method, and relates to the field of tunnel construction. The cavity assembly type tunnel inverted arch comprises aplurality of inverted arch blocks sequentially laid on the bottom surface of a tunnel in the longitudinal direction of the tunnel, a channel longitudinally distributed in the tunnel is formed in thecenter of each inverted arch block, the channels are symmetrically distributed relative to the vertical symmetry plane of the tunnel, and the bottoms of the channels are planes; the tops of the channels are in arched shape; and the channels corresponding to the inverted arch blocks are in sequential butted joint and communication to allow staff to pass through. A channel structure allowing the staff to escape is arranged in the prefabricated inverted arch structure through a prefabricated assembly structure. After the inverted arch structure is continuously arrayed, a rescue channel communicating to a construction point from a safe area outside the tunnel during tunnel construction is formed, a traditional trestle cast-in-place inverted arch construction method is replaced, the construction efficiency is improved, and besides, the safety in the tunnel construction process is guaranteed.
Owner:SHANDONG JIAOTONG UNIV +1

Pump pressure tightness test assembly, broadside pipeline and installation method of broadside pipeline

The invention discloses a pump pressure tightness test assembly, a broadside pipeline and an installation method of the broadside pipeline, and relates to the field of ship installation engineering. Apipe valve assembly comprises a broadside pipe and a broadside valve, the pump pressure tightness test assembly comprises a tightness test sealing plate and a tightness test flange, the tightness test sealing plate is connected to the side end face of the broadside pipe in a sealed mode, a first connecting hole is formed in the center of the tightness test sealing plate, and a first threaded connecting pipe is arranged at the first connecting hole; the tightness test flange is detachably connected to the inlet end of the broadside valve, a second connecting hole is formed in the center of thetightness test flange, and a second threaded connecting pipe is arranged at the second connecting hole; when a pump pressure tightness test is carried out, the broadside valve is closed, a pump pressure hose is connected into the first threaded connecting pipe and the second threaded connecting pipe, and pump pressure is carried out from the two sides at the same time. According to the pump pressure tightness test assembly, the broadside pipeline and the installation method of the broadside pipeline, the pump pressure and the installation difficulty of the broadside pipeline are reduced.
Owner:WUCHANG SHIPBUILDING IND

High-low pressure switching and venting skid-mounted device based on large cluster well set

The present invention provides a high-low pressure switching and venting skid-mounted device based on a large cluster well set. The high-low pressure switching and venting skid-mounted device comprises an outer transporting pipeline; the outer transporting pipeline is disposed on a skid seat; one end of the outer transporting pipeline is parallelly provided with a first interface and a second interface; the other end of the outer transporting pipeline is provided with a natural gas outlet; the outer transporting pipeline is connected with a low pressure venting pipeline, a pressurizing pipeline and a return transporting pipeline after pressurization which are parallelly connected; and the low pressure venting pipeline, the pressurizing pipeline and the return transporting pipeline after pressurization are all disposed on the skid seat. According to the high-low pressure switching and venting skid-mounted device based on the large cluster well set, different requirements of pressurizing and venting of high pressure and low pressure gas wells can be simultaneously satisfied, safety production of the large cluster well set can be guaranteed when emergency cut-off of a downstream gas gathering station or a treatment plant is caused by accidents, land occupation is reduced, construction progress is accelerated, and cost is saved.
Owner:XIAN CHANGQING TECH ENG

Method for judging grade of tunnel surrounding rock in advance through rock breaking products

The invention relates to the technical field of engineering construction, in particular relates to a method for judging the grade of a tunnel surrounding rock in advance through rock breaking products. The method comprises the following steps of 1, drilling the tunnel surrounding rock in a non-core-drilling mode; 2, collecting a bit pressure characteristic in the drilling process; 3, collecting the rock breaking products after drilling; 4, grouping and cataloging the collected rock breaking products according to different collection positions and the sizes of the rock breaking products, and extracting geometric characteristics, mineral components and grading of the rock breaking products through an image recognition technology; and 5, judging the grade of the surrounding rock according tothe geometric characteristics, the mineral components and the grading of the rock breaking products. According to the method, the grade of the tunnel surrounding rock is judged in advance according tothe rock breaking products; a reliable judgment basis is provided for engineers; the function of judging the grade of the surrounding rock in the non-core-drilling mode can be realized; the construction progress of underground engineering is accelerated; and the dynamic change of the surrounding rock and the optimization of supporting facilities are achieved.
Owner:CHENGDU UNIVERSITY OF TECHNOLOGY

Processing system for downlink signal of power distribution automation system

The invention relates to a processing system for a downlink signal of a power distribution automation system. The processing system is composed of an optical fiber communication system, an optical network unit device, a front-end device, a relay device, a terminal device and a coupler. According to the processing system for the downlink signal of the power distribution automation system, hybrid networking of optical fiber communication and carrier communication can be realized, pavement of optical fibers in the aspect of communication line construction can be accordingly reduced, construction cost of communication lines can be further reduced, and construction progress of a smart power grid also can be speeded up.
Owner:DALIAN POWER SUPPLY COMPANY STATE GRID LIAONING ELECTRIC POWER +2

Deep sea wind power generation jacket type single pile composite structure and construction method thereof

The invention relates to a deep sea wind power generation jacket type single pile composite structure and a construction method thereof. According to the technical scheme, the deep sea wind power generation jacket type single pile composite structure is characterized by comprising a large-diameter steel pipe, a transition section, a jacket main body structure and a steel pipe pile, wherein the upper end of the large-diameter steel pipe is located above the crest elevation of the wave action range of a single-pile composite structure service engineering field, and the lower end of the large-diameter steel pipe is located below the bottom elevation of the wave action range; the lower end of the large-diameter steel pipe is connected with the jacket main body structure below the large-diameter steel pipe through the transition section, the lower end of the jacket main body structure is connected with a plurality of steel sleeves, the jacket main body structure is sleeved on the steel pipepile through the steel sleeves, the steel pipe pile is sunk and fixed on a seabed, and high-strength grouting materials are poured between the steel sleeves and the steel pipe pile for connection. The deep sea wind power generation jacket type single pile composite structure is suitable for the offshore wind power generation industry, and particularly suitable for serving as a foundation structure of an engineering field with the water depth exceeding 30 meters.
Owner:POWERCHINA HUADONG ENG COPORATION LTD +2

Framework thin wall type concrete chimney outer wall and building method thereof

InactiveCN110397334AEasy to manageReduce the difficulty of on-site managementTowersConcrete beamsUltimate tensile strength
The invention discloses a framework thin wall type concrete chimney outer wall and a building method thereof. A bottom layer of a chimney in an existing mold overturning construction technology needsto completely achieve a corresponding hardening strength, then a wall body can be upwards built, lots of manual work and time are consumed during formwork erecting, and construction site management isnot facilitated due to small formwork accumulation. The framework thin wall type concrete chimney outer wall comprises a chimney body, and the upper portion of the chimney body is connected with a top hoop; the chimney body comprises a framework structure; the framework structure comprises cast-in-place horizontal concrete beams and concrete columns on bases of the cast-in-place concrete beams; thin wall arc-shaped prefabricated plates are installed between the concrete columns; the lower ends of the thin wall arc-shaped prefabricated plates are located on the horizontal concrete beams; the horizontal direction of the thin wall arc-shaped prefabricated plates is connected with the concrete columns, or the thin wall arc-shaped prefabricated plates are horizontally connected and then are connected with the concrete columns; the upper ends of the thin wall arc-shaped prefabricated plates are used for supporting the concrete beams on the upper portions; the curved faces of the thin wall arc-shaped prefabricated plates are part of the surface of a conical body; the concrete columns and the concrete beams jointly form a concrete net in a cone frustum shape; and the concrete net where the thin wall arc-shaped prefabricated plates are embedded forms the chimney outer wall. The framework thin wall type concrete chimney outer wall is used for chimney building.
Owner:刘旭

Modular house wall integrated with water guide pipe

The invention discloses a modular house wall integrated with a water guide pipe, and relates to the technical field of modular houses. The wall comprises a wall body, a plurality of water supply pipesand springs are arranged in the wall body, the two ends of the water supply pipes are sleeved with connectors and bent pipes respectively, and grooves and convex edges are arranged on the two side faces of the wall body respectively. Wall modules are convenient to assemble and disassemble by additionally arranging the convex edges and the grooves, the house construction speed is increased, laborand cost are greatly reduced, damage caused by infirmness and looseness after wall assembly is prevented by additionally arranging the fixing clamping plates and the studs, the risk is reduced, safetyis improved, and indoor water conveying is facilitated by additionally arranging the water conveying pipes. Holes do not need to be additionally dug to arrange conveying water pipes, so that the wallis damaged, construction waste and dust pollute the environment, the connectors and the bent pipes are arranged at the joints of the wall plates, the sealing performance of the conveying water pipesin the wall is enhanced, the springs are added to reduce noise, vibration is reduced, the service life of the spliced wall is prolonged, and shock resistance is improved.
Owner:GOLD MANTIS FINE DECORATION TECH SUZHOU CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products