Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

13results about How to "Prevent buildup" patented technology

Method, device and vehicle for checking charging remaining time

ActiveCN119502759Bprevent buildupavoid calculationData packBattery charge
The application discloses a charging remaining time confirmation method, device and vehicle, relates to the battery charging technical field, and discloses a charging remaining time confirmation method, which comprises the following steps: obtaining current charging data of a battery pack, wherein the current charging data comprises a charging rate and an SOC value; obtaining a temperature rising charging time and a temperature rising charging end SOC value based on the current charging data and a first charging model; obtaining a constant temperature charging time based on the temperature rising charging end SOC value and a second charging model; and confirming a charging remaining time based on the temperature rising charging time and the constant temperature charging time.According to the basic characteristics of the temperature in the low-temperature fast charging process, the charging remaining time is calculated in sections, the fast and accurate calculation of the fast charging remaining time is realized in combination with a fitting method and given data, and the overcomplicated calculation and the model building and calculation of heat generation, heat conduction and heat dissipation are avoided.
Owner:DONGFENG MOTOR GRP

A sealing device for a conduit.

ActiveCN224443609URealize blockingavoid working at heightsInjection portLine tubing
This utility model relates to the field of sealing conduits, and particularly to a sealing device for conduits, comprising a gripping rod, a pressurizing component, a pressure line, and an injection mechanism for extending into the conduit port. The end of the gripping rod is detachably connected to a storage container for adhesive, and the injection mechanism is detachably connected to the outlet of the storage container for adhesive, with an injection port communicating with the outlet. The pressurizing component is connected to the pressure line, which is detachably connected to the storage container for adhesive. The operator uses the gripping rod to raise the storage container for adhesive to a designated position and inserts the injection mechanism into the conduit port. Pressure is transmitted through the pressure line to inject adhesive into the conduit port, achieving the purpose of sealing the conduit at a high location. When sealing conduit ports at high locations, scaffolding is avoided, reducing scaffolding costs and ensuring the safety of workers.
Owner:CHINA PETROLEUM & CHEMICAL CORP +1

Solution of joint path and destination planning problem based on distributed algorithm for solving generalized nash equilibrium

ActiveCN116305754Bprevent buildupGuaranteed solution accuracyForecastingDesign optimisation/simulationGradient operatorsAlgorithm
This invention discloses a solution to the joint path and destination planning problem based on a distributed generalized Nash equilibrium algorithm. First, the joint path and destination planning problem is modeled, transforming it into a non-cooperative game model. This model includes the objective function of each electric vehicle, global coupling constraints, and local constraints. Second, pseudo-gradients are used to transform the game model into a VI problem, introducing edge-based consistency constraints and a heterogeneous step size mechanism. Based on fixed-point iteration and proximal gradient operator theory, a distributed solution algorithm under complete information is proposed. Then, a global estimate of the plans of other users is introduced, proposing a distributed solution algorithm under partial information. This invention avoids the construction of double random matrices through edge-based consistency constraints, and can maintain solution accuracy while meeting low computational requirements when more users participate in the game model.
Owner:SOUTHWEST UNIV

A cable tower active cross brace

ActiveCN224351083Uprevent buildupfirmly connectedBridge structural details
The utility model relates to cable tower technical field, concretely discloses a cable tower initiative cross -bracing, including cable tower, the both sides of cable tower middle part are connected with walking passageway, and the both sides of cable tower middle part are provided with initiative cross -bracing, initiative cross -bracing, the top of initiative cross -bracing is connected with support steel frame, and support steel frame top is provided with movable platform, and the middle part of movable platform is connected with platform board, and one side of platform board is provided with inlaying block, and the side away from inlaying block of platform board is provided with cooperation piece. Through the initiative cross -bracing and support steel frame that setting in this device, can be in the stable support of the cable tower, support steel frame also can take initiative cross -bracing as base to support movable platform, avoided the construction of bottom support structure when movable platform erection. Solveed two cable tower to build inwards and incline, make it easy to be affected by external force and shake, and when the high construction platform is built between cable tower, the erection and removal are very difficult.
Owner:SICHUAN JIAOTOU CONSTR ENG CO LTD

New energy automobile working parameter simulation display device and display method

PendingCN122290423Aprevent buildupconducive to the popularization ofNew energyControl engineering
This invention discloses a simulation display device and method for operating parameters of new energy vehicles, comprising: at least one simulation module; the simulation module comprising: a mapping unit for converting target parameters in the technical principle of the target new energy vehicle into mapping parameters under the safety domain; a first control unit for generating control commands; a physical simulation model unit connected to the first control unit and the mapping unit respectively, for receiving control commands and outputting mapping parameters based on an equivalent physical model; and a display unit connected to the physical simulation model unit; wherein the display unit includes a driving subunit and a physical effect generator; the driving subunit is used to drive one or more locally configured physical effect generators according to the mapping parameters; the dynamic response characteristics of the physical effect generator reflect the time-varying law of the target parameters, thereby reducing the cost of use and improving the operator's understanding of data changes.
Owner:HANGZHOU POLYTECHNIC

Assembly type frame structure beam column connecting structure and construction method thereof

PendingCN121952225Aprevent buildupShorten prefabrication processing cycleBuilding material handlingPrefabricationSupport plane
The invention discloses an assembly type frame structure beam column connecting structure, relates to the field of assembly type frame structures, and aims to solve the problem that the efficiency is low in the prefabrication manufacturing and transportation process of traditional prefabricated beams and columns, the technical scheme is characterized in that the assembly type frame structure beam column connecting structure comprises a column body and a column cap, and the column cap covers the end face of the column body; the column cap comprises a placing block arranged in the X-axis direction of the top face of the column body, the two ends, in the X-axis direction of the top face of the column body, of the placing block extend out of the top face of the column body, the two sides, in the Y-axis direction of the top face of the column body, of the placing block are flush with the two sides, in the Y-axis direction, of the top face of the column body, and supporting frames for supporting beam ends are arranged on the two sides, in the Y-axis direction, of the placing block. The effect of improving the manufacturing and transporting efficiency of the prefabricated beams and columns is achieved.
Owner:ANHUI SANJIAN ENG

Method and apparatus for training a reinforcement learning system for automated bidding

ActiveCN116611499BAccurately describe impression distributionAccurately describe non-stationarityAdvertisementsBiological modelsEngineeringData mining
The embodiments of the present specification disclose a method and device for training a reinforcement learning system for automatic bidding. The reinforcement learning system comprises an environment model and an agent, the environment model is used to predict the state distribution of a business environment, the business environment state comprises the budget consumption and the obtained business value of a business party, and the agent is used to determine the current bidding parameter of the business party according to the current environment state. The method comprises: firstly training the environment model by using a plurality of historical samples, wherein any first historical sample comprises a first state of a business environment, a first bidding parameter, and a second state of the business environment after the business environment is changed by using the first bidding parameter under the first state; and secondly training the agent by using a plurality of state-bidding parameter pairs constructed based on the sampling of the environment state space and the bidding parameter space, and the predicted state distribution corresponding to each state-bidding parameter pair obtained by inputting the state-bidding parameter pair into the trained environment model.
Owner:ANT DIGITAL INFORMATION TECHNOLOGY (SHANGHAI) CO LTD

A method, apparatus, device, and medium for voice QoS optimization and playback with end-to-end source encryption.

ActiveCN121690858Breduce misjudgmentReduce voice lag
This application discloses a method, apparatus, device, and medium for voice QoS optimization and playback for end-to-end source encryption, relating to the field of instant messaging. The method includes: storing received encrypted voice data packets in ciphertext form into a jitter buffer; determining the current target buffer level of the jitter buffer based on the current network jitter level and the latency introduced by the current decryption process; generating a playback control strategy and a decryption scheduling strategy based on the current actual buffer level and the current target buffer level; the decryption scheduling strategy includes the frequency, triggering timing, and execution priority of decryption operations, and adjusts the decryption scheduling strategy based on the real-time playback control strategy and the jitter buffer state; scheduling corresponding encrypted voice data packets from the jitter buffer for decryption using the decryption scheduling strategy; and decoding and playing the decrypted voice data packets according to the playback control strategy. This application improves the overall smoothness of encrypted real-time voice communication.
Owner:CETC CYBERSPACE SECURITY TECH CO LTD

A movable drilling and grouting pile construction platform and construction method

PendingCN122082419Aprevent buildupavoid demolitionArtificial islandsUnderwater structuresArchitectural engineeringJetty
This invention relates to a movable bored pile construction platform and construction method, belonging to the field of bored pile construction technology. The entire construction process involves moving the movable platform as a whole. First, the movable platform is hoisted to the current work surface and supported by temporary support frames located on both sides of the wharf's width. After the current work surface is completed, the movable platform is then moved horizontally along the length of the temporary support frames to the next work surface until construction is complete. This entire construction process avoids the need for multiple stages of erecting and dismantling the steel platform piece by piece, significantly saving costs and improving construction efficiency.
Owner:GUANGDONG YUANDA BRIDGE STEEL STRUCTURE LEASING CO LTD

Stock bin with uniform feeding function

ActiveCN224178883Ureduce buildupExpand coverage areaAnimal feeding devicesBunkerMechanical engineering
The utility model discloses a stock bin capable of achieving uniform feeding. The stock bin comprises a stock bin body, a first conveying unit and a second conveying unit. A discharge port is formed in one end of the first conveying unit, the first conveying unit is arranged at the bottom of the feed bin, a feed leakage port is formed in the bottom of the feed bin and located above the second conveying unit, and the first conveying unit is used for conveying feed flowing out of the feed leakage port to the discharge port; the second conveying unit is located on the lower surface of the interior of the feed bin and comprises a first conveying part and a second conveying part, and the first conveying part and the second conveying part are located on the two sides above the feed leakage opening correspondingly and used for conveying feed at the end of the feed bin to the feed leakage opening; the feeding device has the advantages of being uniform in feeding and large in feeding coverage area.
Owner:HAOZHI (CHANGZHOU) INTELLIGENT TECH CO LTD

Real-time obstacle avoidance method and device for unmanned aerial vehicle and medium

PendingCN121879407AReal-time obstacle avoidanceImprove autonomous obstacle avoidance capabilitiesVehicle position/course/altitude controlPosition/direction controlLoop controlDecision networks
The invention provides a real-time obstacle avoidance method and device for an unmanned aerial vehicle and a medium. The method comprises the following steps: acquiring a synchronous binocular image of the unmanned aerial vehicle; obtaining a corresponding disparity map according to the synchronous binocular image, and carrying out optimization processing to obtain an optimized disparity map; acquiring a flight state vector of the unmanned aerial vehicle; inputting the optimized disparity map and the flight state vector into an end-to-end decision network to obtain a control instruction; and performing security constraint processing on the control instruction, and sending the control instruction after the security constraint processing to the flight control, so that the flight control executes closed-loop control based on the control instruction after the security constraint processing, thereby realizing real-time obstacle avoidance of the unmanned aerial vehicle. According to the method, the device and the medium, the problem that the autonomous obstacle avoidance capability and the reliability of the unmanned aerial vehicle are not high in a resource-limited scene according to an existing unmanned aerial vehicle real-time obstacle avoidance method can be solved.
Owner:CHANGSHA MYSTICAL BOW INFORMATION SCI & TECH CO LTD

Three-dimensional river channel model construction method and system for seismic simulation, and storage medium

This invention relates to a method, system, and storage medium for constructing a three-dimensional river channel model for earthquake simulation. The method includes: setting the length, width, and height of the three-dimensional river channel model; setting the display planar range based on the length, width, and height; setting the number of interfaces in the three-dimensional river channel model; and adjusting and controlling all interface layers within the planar range; setting the river channel name; obtaining a planar distribution map of the central control points; obtaining a primary and secondary river channel connection map based on the central control point planar distribution map to generate a river channel depth planar map; and selecting interface layers and rivers to obtain a three-dimensional display map of the interface layers and rivers. This invention can construct arbitrarily diverse three-dimensional rivers, providing a variety of three-dimensional river channel big data for intelligent river channel identification methods, which is beneficial to improving the adaptability of intelligent river channel identification methods. This invention can be applied in the field of reservoir geophysics.
Owner:CHINA NATIONAL OFFSHORE OIL (CHINA) CO LTD +1

Multi-unmanned aerial vehicle and multi-sensor intelligent task matching system

The invention discloses a multi-unmanned aerial vehicle and multi-sensor intelligent task matching system and method, and relates to the technical field of unmanned aerial vehicles. The method comprises the following steps: acquiring task information of a to-be-allocated task and real-time state information of a plurality of unmanned aerial vehicles; constructing a space-time K-D tree index based on the four-dimensional space-time coordinates contained in the unmanned aerial vehicle; for each to-be-allocated task, based on the space-time attribute defined by the task information, executing range query in the space-time K-D tree index to screen out a candidate unmanned aerial vehicle set meeting conditions, thereby generating a sparse candidate matching pair set; and calculating a matching income only for the matching pairs in the sparse candidate matching pair set, and solving an optimal task allocation scheme based on a calculation result. According to the method, pre-pruning is carried out by constructing the spatio-temporal index, the solving scale and calculation complexity of a matching problem are remarkably reduced, and the task matching real-time performance and efficiency of a large-scale unmanned aerial vehicle cluster in a dynamic environment are improved.
Owner:SHANGHAI BINY ELECTRIC