Gas controL method for air return corner of fuLLy-mechanized caving face
A corner and gas technology, which is applied in the field of gas control in the return air corner of the fully mechanized caving face, can solve the problems of high gas concentration and the inability to effectively control the gas in the return air corner of the coal mining face.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] figure 1 Shows the flow chart of the method for controlling gas at the return wind corner of a fully mechanized caving face according to an embodiment of the present invention. Such as figure 1 As shown, the method for controlling gas in the return air corner of a fully mechanized caving face provided by the embodiment of the present invention is suitable for the face of inclined longwall coal mining, especially the face of coal mining where high gas and rock bursts are intertwined.
[0024] The embodiment of the present invention provides a method for controlling gas at the return wind corner of a fully mechanized caving face, which includes:
[0025] S110, in the craft lane, within the first predetermined distance of the advance coal mining face, construct at least one set of first high-level drilling to the goaf above the return air corner;
[0026] The first high-level drilling is constructed in the craft lane, and the first high-level drilling is an oblique hole. The fir...
Embodiment 2
[0036] On the basis of the above-mentioned embodiment 1, optionally, S110, in the process roadway, within the first predetermined distance of the advance coal mining face, before the construction of the first high-level drilling to the goaf above the return air corner includes:
[0037] Blast all the pre-split holes within the first predetermined distance of the advanced coal mining face in the craft lane.
[0038] By blasting all the pre-split holes in the first predetermined range of the advanced coal mining face, the impact on the surrounding rock during the first high-level drilling can be reduced for better construction.
[0039] Preferably, S130, in the return air trough, within the second predetermined distance from the end cut top line, the construction of the second high-level drilling to the return air corner roof crack zone includes:
[0040] Perform end-cutting blasting on the end roof plate within the second predetermined distance from the end-cutting line in the return wi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


