Scheduling real-time section data generation method and system
A cross-section data and cross-section technology, which is applied in the field of dispatching real-time cross-section data generation methods and systems, can solve the problems of discrete time information and inconsistent update time, so as to improve accuracy, reduce storage pressure, and eliminate asynchronous measurement effect of influence
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] Embodiment 1: as figure 1 A dispatching real-time cross-section data generation method shown in the figure stores and organizes discrete steady-state data with time scales according to time scales, and provides synchronous power grid real-time data ideal cross-sections for basic power system applications such as state estimation, which is conducive to improving the dispatching control system The accuracy of data analysis and other related applications supports the development of related applications with time scales. The steps are as follows:
[0059] Step 1: collecting measurement data and working condition information, and integrating the collected measurement data and the working condition information;
[0060] Step 2: Periodically store the integrated measurement data according to the preset time interval;
[0061] Step 3: Based on the periodically stored measurement data, the generated section data is extracted according to the preset section time.
[0062] Speci...
Embodiment 2
[0108] Based on the same inventive concept, the present invention also provides a scheduling real-time section data generation system, such as image 3 shown, including:
[0109] Data collection and integration module: used to collect measurement data and working condition information, and integrate the collected measurement data with the working condition information;
[0110] Periodic storage module: used to periodically store the integrated measurement data according to the preset time interval;
[0111] Section generating module: used for extracting the generated section data according to the preset section time based on the periodically stored measurement data.
[0112] The data collection and integration module includes: a data collection sub-module and a data integration sub-module;
[0113] The data collection sub-module is used to collect measurement data and working condition information;
[0114] The data integration sub-module is used to perform time-scale measu...
PUM

Abstract
Description
Claims
Application Information

- Generate Ideas
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com