Construction method of a road roadbed structure
A construction method and roadbed technology, which is applied in the direction of infrastructure engineering, roads, roads, etc., can solve the problems that the technical requirements for road foundation reinforcement cannot be met, and the design scheme is not feasible, so as to increase piling efficiency, prevent road surface subsidence, and improve durability. Improved effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] Such as Figure 1-5 As shown, a road subgrade structure includes: a base layer 1, and a plurality of pipe piles 2 vertically inserted into the base layer at the bottom, the upper part of the pipe piles vertically protrudes from the upper surface of the base layer, and side guards are arranged on both sides of the roadbed Dun 3, the part of the side shield goes deep into the base layer, and part of the cross section deep into the base layer is rectangular, and the cross section of the part above the base layer of the side shield is a right-angled trapezoid, and the inclined section of the right-angle trapezoid faces outward to form the side slope of the subgrade 4, above the base layer The first geotextile layer 5 is laid, on the first geotextile layer is a gravel cushion 6, on the gravel cushion is laid a second geotextile layer 7, on the second geotextile is a solidified fill layer 8, the top of the pipe pile and The upper end of the side cover is flush with the surfac...
Embodiment 2
[0022] A construction method for a road subgrade. The road subgrade includes: a base layer, and a plurality of pipe piles whose lower parts are vertically inserted into the base layer. , the part of the side shield goes deep into the base layer, and the part of the cross-section deep into the base layer is rectangular, and the section above the base layer of the side shield is a right-angled trapezoid, and the inclined section of the right-angle trapezoid faces outward to form the side slope of the subgrade. Above the base layer, lay the first Geotextile layer, the first geotextile layer is a gravel cushion, the second geotextile layer is laid on the gravel cushion layer, the second geotextile layer is a solidified filling layer, the upper end of the pipe pile and the upper end of the side protection Dun are connected to the solidified The surface of the filling layer is flush, and a concrete pavement base is laid on the upper end of the pipe pile and the side protection and th...
Embodiment 3
[0027] A construction method for a road subgrade structure. The road subgrade structure includes: a base layer, and a plurality of pipe piles whose lower parts are vertically inserted into the base layer. The upper parts of the pipe piles vertically protrude from the upper surface of the base layer. Hudun, the part of the side Hudun goes deep into the base layer, and the part of the cross section deep into the base layer is rectangular, and the section above the base layer of the side Hudun is in the shape of a right-angled trapezoid, and the inclined section of the right-angled trapezoid is outwardly formed to form the side slope of the subgrade. Laying above the base layer The first geotextile layer, the gravel cushion is laid on the first geotextile layer, the second geotextile layer is laid on the gravel cushion layer, the solidified filling layer is placed on the second geotextile layer, the upper end of the pipe pile and the upper end of the side protection It is flush wi...
PUM
| Property | Measurement | Unit |
|---|---|---|
| compressive strength | aaaaa | aaaaa |
| compressive strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 