Unlock instant, AI-driven research and patent intelligence for your innovation.

Quick entering-rock hole-forming construction method of manual hole digging pile

An artificial hole-digging pile and construction method technology, which is applied to sheet pile walls, earthwork drilling, infrastructure engineering, etc., can solve the problems of heavy dust in the working environment of workers, slow construction progress, quality defects, etc. Control, construction pollution is small, the effect of improving efficiency

Inactive Publication Date: 2018-12-07
SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the manual excavation piles under the rock foundation mainly adopt the construction plan of pneumatic pick crushing, static blasting, pneumatic pick crushing + static blasting, the working environment of workers is dusty, the construction progress is slow, and there are certain quality defects and safety defects. Hidden danger

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Quick entering-rock hole-forming construction method of manual hole digging pile
  • Quick entering-rock hole-forming construction method of manual hole digging pile
  • Quick entering-rock hole-forming construction method of manual hole digging pile

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] The present invention is further illustrated below by specific examples.

[0019] Such as figure 1 , figure 2 with image 3 as shown,

[0020] A kind of construction method of rapidly entering rock into holes for manual excavation piles, comprising

[0021] Step 1. Set up the support: The construction support is erected by ordinary steel pipe scaffolding, which is used as the support for the machinery in the slag discharge and hoisting holes during the construction process. After the support is erected, fix the drilling core machine on the support and turn on the power. Debug to normal working state;

[0022] Step 2. Drill holes around the pile hole to form an isolation trench; after all the preparations are completed, arrange the drilling rig to take the core, and arrange the drill to take the core around the marked pile hole inner wall Points, the number of coring points = pile hole circumference / core bit diameter;

[0023] Step 3. Drill the rock around the p...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of building construction, in particular to a quick entering-rock hole-forming construction method of a manual hole digging pile. The quick entering-rock hole-formingconstruction method is characterized by comprising the steps that a support is erected; core-taking points of a drilling machine are placed; rocks around a pile hole are drilled; holes are formed inrock core of the pile hole and rocks are removed by hydraulic expansion; holes are drilled in the two flaps broken pile cores, a hydraulic splitting splitter is inserted, the pile cores are broken, the steps are repeated 2-3 times, and the pile cores are decomposed into small pieces which can be carried and transported to a designated slag site; and the steps are repeated until the holes are drilled to the depth of the designed pile hole. The construction method has no vibration, no impact, no dust and little noise in the whole construction process, has the characteristics of high constructionspeed, controllable hole-forming quality and small construction pollution, and well solves the construction problem of pile holes of the manual hole digging pile under a rock foundation.

Description

technical field [0001] The invention relates to the field of building construction, in particular to a construction method for rapidly entering rocks and forming holes for manual hole-digging piles. Background technique [0002] Cast-in-situ piles are currently dominated by mechanical hole-forming, but due to the limitations of construction technology, site conditions, engineering geology and pile cross-sections, especially large-diameter round piles and rectangular piles under rocky foundations in mountainous areas, manual hole-dug piles are still widely used. used in engineering practice. [0003] The construction of the pile hole of the pile into the rock is a key link in the construction of the artificially dug holed cast-in-situ pile, and it has a decisive influence on the construction progress, quality and cost of the artificially dug holed cast-in-situ pile. At present, the manual excavation piles under the rock foundation mainly adopt the construction plan of pneuma...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21B25/10E21B25/00E02D5/34
CPCE02D5/34E21B25/005E21B25/10
Inventor 吴仕飞王兴康段小军徐明邓杨
Owner SHANGHAI ERSHIYE CONSTR CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More