Highway project management system based on B/S architecture

A project management system, S-frame technology, applied in data processing applications, resources, computing, etc., can solve problems such as confusion in highway project management, and achieve the effects of optimizing personnel allocation, reducing costs, and being highly professional.

Inactive Publication Date: 2018-12-18
李茜茜
View PDF3 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] The object of the present invention provides a highway project management system based on B / S architecture, which solves the problem of chaotic highway project management in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Highway project management system based on B/S architecture
  • Highway project management system based on B/S architecture
  • Highway project management system based on B/S architecture

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0042] This embodiment provides a highway project management system based on B / S architecture, such as Figure 1 to Figure 5 shown.

[0043] A highway project management system based on B / S architecture, comprising: a service end and a plurality of client browsers; the service end comprises a Web server, an application server and a database server which are sequentially connected by communication; the Web server and a plurality of Client browser communication connection;

[0044] The web server is used to receive the user request sent by the client browser, process the user request, access the database server as required, and return the processing structure to the client browser;

[0045] The application server is used to receive user requests from the Web server, and process business functions according to the requirements of the requests. When data operations are required, it makes user requests to the data server, receives data responses from the data server, and Provide ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the field of network information technology, in particular to a highway project management system based on a B / S structure, a server and a plurality of client browsers; the server comprises a Web server, an application server and a database server, which are connected in sequence by communication. The Web server is communicatively connected with a plurality of client browsers; the invention improves the informationization level of highway project management, effectively reduces highway construction cost, reduces highway construction risk, improves engineering efficiency, and optimizes personnel allocation, reduces costs, reduces risks, improves efficiency and optimizes staffing; The detail processing of the core module has integrity and humanization, strong professionalism and ease of use.

Description

technical field [0001] The invention belongs to the technical field of network information, and in particular relates to a highway project management system based on B / S architecture. Background technique [0002] The overall level of highway construction in my country is still relatively low, mainly due to the relatively low degree of informatization of construction management of engineering projects, relatively extensive and backward management methods, large artificial randomness, weak supervision of the construction market, and difficult quantitative assessment of the monitoring of the construction process , follow-up evaluation, and accurate grasp. Some project management software is only used as a measurement and change tool, and project managers still do more written work, ignoring the application of project management software. The planning and progress management functions in the software are not fully applied, resulting in A large amount of statistical summary work...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
CPCG06Q10/06
Inventor 李茜茜
Owner 李茜茜
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products