A production process for slotting outer conductor of leaky cable
A production process and outer conductor technology, which is applied in cable/conductor manufacturing, leaky waveguide antenna, waveguide, etc., can solve the problems of affecting the quality of use, long mold opening time, high mold cost, etc., to avoid waste or pollution, save operation, Produce efficient and reliable results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0020] A production process for slotting the outer conductor of a leaky cable: after the semi-finished product output in the leaky cable insulation process is completed, use a numerically controlled laser cutting device to laser cut the corresponding slot holes on the thin copper strip according to the set slotting parameters, and produce The outer conductor is slotted, and then the slotted thin copper strip is directly covered on the insulation through the outer conductor longitudinal wrapping mold, and finally the sheath production is directly completed through the extruder to produce the finished leaky cable, so that the leaky cable The three processes of the outer conductor from the raw material to the punching of the raw material, the longitudinal wrapping and the outer sheath after the outer conductor is formed are completed on one production line in sequence, and the metal strip slotting and the metal strip longitudinal wrapping and sheathing process production line are c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com