A production process for slotting outer conductor of leaky cable
A production process and outer conductor technology, which is applied in cable/conductor manufacturing, leaky waveguide antenna, waveguide, etc., can solve the problems of affecting the quality of use, long mold opening time, high mold cost, etc., to avoid waste or pollution, save operation, Produce efficient and reliable results
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2019-06-21
Abstract
Description
technical field
[0001] The invention relates to the technical field of making leaky cables, in particular to a production process for slotting outer conductors of leaky cables. Background technique
[0002] Leaky coaxial cable is a special type of radio frequency coaxial cable. The special feature is that a series of slots need to be made on the outer conductor that acts as a shield, so that the electromagnetic energy transmitted inside the leaky cable can pass through the slots. The hole leaks radiation outward, and the electromagnetic energy in the external environment of the leaky cable can be coupled and absorbed inward through the slot hole to complete the signal interaction between the leaky cable and the external environment, and to meet the requirement of mobile communication along the line (along the laying direction of the leaky cable). signal request.
[0003] Leaky coaxial cables can be divided into coupling type leaky cables and radiation type leaky cables acco...
Examples
Embodiment Construction
[0020] A production process for slotting the outer conductor of a leaky cable: after the semi-finished product output in the leaky cable insulation process is completed, use a numerically controlled laser cutting device to laser cut the corresponding slot holes on the thin copper strip according to the set slotting parameters, and produce The outer conductor is slotted, and then the slotted thin copper strip is directly covered on the insulation through the outer conductor longitudinal wrapping mold, and finally the sheath production is directly completed through the extruder to produce the finished leaky cable, so that the leaky cable The three processes of the outer conductor from the raw material to the punching of the raw material, the longitudinal wrapping and the outer sheath after the outer conductor is formed are completed on one production line in sequence, and the metal strip slotting and the metal strip longitudinal wrapping and sheathing process production line are c...