Method for evaluating construction effect of remedial operation in underground workover operation
An evaluation method and technology in operation, which is applied in the direction of wellbore/well components, earthwork drilling and production, complex mathematical operations, etc., can solve problems such as increased difficulty of operation measures, coexistence of multiple evaluation methods, and poor efficiency, so as to avoid Effects of overhaul and complex operations, improvement of measure operation quality, and improvement of workover operation quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] A method for evaluating the construction effect of measure operations in downhole workover operations, comprising the following steps:
[0049] (a) Determine the evaluation index set U of the measure operation, U={oil increment u 1 , validity period u 2 , effective u 3 , construction period u 4 , Injection amount u 5 , water injection pressure u 6};
[0050] (b) Determine the evaluation set V of the job effect, V={good v 1 , better v 2 , generally v 3 , poorer v 4 , difference v 5};
[0051] (c) Determine the weight W of each evaluation index;
[0052] (d) Given the evaluation matrix R=(R 1 , R 2 , R 3 , R 4 , R 5 , R 6 ) T , R i =(r i1 ,r i2 ,r i3 ,r i4 ,r i5 ), where the element R i =U i ×W i , i=1,2,…,6, where U i For each evaluation index in the index set U, W i is the weight corresponding to the evaluation index, element r ij is the possibility degree of the j-th evaluation of the i-th evaluation index;
[0053] (e) Establish a fuzzy ...
Embodiment 2
[0056] A method for evaluating the construction effect of measure operations in downhole workover operations, characterized in that it comprises the following steps:
[0057] (a) Determine the evaluation index set U of the measure operation, U={oil increment u 1 , validity period u 2 , effective u 3 , construction period u 4 , Injection amount u 5 , water injection pressure u 6}; Standardize the data of each index in the index set U by the range normalization method:
[0058] (1) There are s evaluation blocks, based on 6 evaluation indicators, an index data matrix Y=(y ij ) s×6 ;
[0059] (2) When the jth index is a very large index, that is, the index value y ij When the bigger the better, the conversion formula is:
[0060]
[0061] When the jth index is a very small index, that is, the index value y ij When the smaller the better, the transformation formula is:
[0062]
[0063] (3) by the two conversion formulas, the index data matrix Y is converted into a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com