Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

41results about How to "Prevent overhaul" patented technology

System for remotely monitoring energy consumption of central air-conditioning

The invention discloses a system for remotely monitoring energy consumption of a central air-conditioning, which comprises a data acquisition terminal, an on-site work station and a data processing center. The data acquisition terminal is used for acquiring on-site data according to a preset sampling period, wherein the on-site data comprises central air-conditioning energy consumption parameters, environmental parameters and equipment operating parameters; the on-site work station is used for receiving the on-site data transmitted by the data acquisition terminal, and identifying, encrypting, packaging and transmitting the on-site data; and the data processing center is used for receiving the identified, encrypted and packaged on-site data which is transmitted by the on-site work station, and storing, managing and analyzing the on-site data. The on-site data is analyzed and processed by the data processing center, the central air-conditioning operating state can be monitored on line, real-time fault alarm is provided, and long-term safe operation of the system is guaranteed. The central air-conditioning energy consumption data is stored and managed for a long time, and the energy consumption rule is analyzed for a user by means of real-time data monitoring and other technical means; therefore, the energy-saving benefit is kept for a long time and even continuously increased.
Owner:SHENZHEN DAS INTELLITECH CO LTD

Device for reinforcement, energy dissipation and seismic mitigation of tenon and mortise joint of timber structure

The invention discloses a device for reinforcement, energy dissipation and seismic mitigation of a tenon and mortise joint of a timber structure. The device for reinforcement, energy dissipation and seismic mitigation of the tenon and mortise joint of the timber structure comprises a wood beam, a wood pole, the tenon and mortise joint, embedded steel bars, joint connecting pieces and joint fastening pieces, wherein the wood beam is connected with the wood pole through the tenon and mortise joint, conduits are formed in the upper end surface and the lower end surface of the wood beam or in the two lateral surfaces of the wood beam respectively, the embedded steel bars are embedded in the conduits in advance, the conduits are sealed through small battens and special structural adhesive, one end of each joint connecting piece is connected with a corresponding embedded steel bar, the other end of each joint connecting piece is connected with a corresponding joint fastening piece, and the joint fastening pieces penetrate through the pole body of the wood pole and are fixed on the side, back on to the wood beam, of the wood pole through anchor plates and cushion blocks. The device for reinforcement, energy dissipation and seismic mitigation of the tenon and mortise joint of the timber structure is high in bending resistance, energy-dissipation capacity and ductility, and capable of guaranteeing stability of the structure under the small earthquake condition, achieving serious deformation under the large earthquake condition to control structural damage, and achieving automatic restoration of the structure after an earthquake.
Owner:NANJING UNIV OF TECH

Wind power plant equipment state evaluation and maintenance decision support detection method and system

InactiveCN108491990AMonitor running statusOptimizing maintenance test itemsResourcesDecision systemCharge detection
The invention provides a wind power plant equipment state evaluation and maintenance decision support detection method. The method comprises the steps of (1) collecting and analyzing information whichcomprises technical data related to equipment patrol records, fault statistics and equipment running conditions; (2) performing charged detection: effectively monitoring a running state of wind powerplant equipment through the data collected by an instrument, and performing fault detection and prevention; (3) implementing state maintenance of a decision making system: by collecting and analyzingrunning data of the equipment, carrying out state evaluation work on the equipment to determine whether the equipment needs to be maintained or not and maintenance items; and (4) establishing an equipment pre-test maintenance optimization scheme: by implementing the state maintenance of the wind power plant equipment and the charged detection of the equipment, performing state evaluation on the equipment according to wind power plant equipment state evaluation rules, and customizing a maintenance policy. The invention furthermore discloses a corresponding detection system. The maintenance test cycle is prolonged, and maintenance test items are optimized, so that the maintenance test expense is reduced, excessive maintenance and lacking maintenance of the equipment are prevented, and the equipment stability is further improved.
Owner:BEIJING TIANRUN NEW ENERGY INVESTMENT CO LTD

State test method and system of wind power plant equipment live detection

The invention provides the state test method of wind power plant equipment live detection. The method comprises the following steps of (1) carrying out live detection: using an apparatus to collect data, implementing the live detection combining ultrasonic partial discharge detection and ultraviolet imaging detection, monitoring the operation state of wind power plant equipment, and carrying out fault detection and prevention; (2) constructing decision system state overhauling: collecting and analyzing the operation data of the equipment, and carrying out state evaluation work on the equipmentso as to determine whether the equipment needs overhauling and determine overhauling items; (3) establishing an equipment pre-test overhauling optimization scheme: through wind power plant equipmentstate overhauling, combining the implementation of equipment live detection, according to a power plant equipment state evaluation rule, carrying out state evaluation on the equipment, and making a customized overhauling strategy. The invention also discloses a corresponding detection system. A live detection method combining the ultrasonic partial discharge detection and the ultraviolet imaging detection is adopted, a test project is optimized and pre-test overhauling cost is saved.
Owner:BEIJING TIANRUN NEW ENERGY INVESTMENT CO LTD

Sand protection matching pipe string for high-throughput sand filter pipe

ActiveCN103470229AIncrease the effective oil passing areaOvercoming the drawbacks of clogging and reducing oil production efficiencyDrilling rodsFluid removalHigh fluxCoupling
The invention relates to a sand protection matching pipe string for a high-throughput sand filter pipe. The sand protection matching pie string comprises a packer, a conversion coupling, a high-throughput sand filter pipe and a time delay self-locking valve or plug, wherein the conversion coupling is connected with the packer and is arranged at the back end of the high-throughput sand filter pipe, and the time delay self-locking valve or plug is arranged at the front end of the high-throughput sand filter pipe; high-throughput sand filter units are sequentially connected by a double-male left-hand coupling end to end to form the high-throughput sand filter pipe, and a high-temperature resistant broken centralizer is arranged on the outer surface of the middle of the double-male left-hand coupling; and a broken bracket is arranged between the high-temperature resistant broken centralizer arranged on the outer surface of the double-male left-hand coupling and the high-throughput sand filter unit. The high-temperature resistant broken centralizer can ensure that the high-throughput sand filter pipe is positioned at the center of a shaft, so that formation fluid evenly supplies fluid to a sand filter from the shaft, and meanwhile, the wear of the shaft to the sand filter in the logging process is reduced, the success rate of logging is ensured, the breaking is easy, and the replacement operation is not affected.
Owner:SHANDONG UNIV +1

Enterprise energy efficiency management system and management and control method therefor

The invention discloses an enterprise energy efficiency management system and a management and control method therefor, and belongs to the field of energy management. The system comprises an information collection unit, an information processing unit, a control unit, and an operation unit. The information collection unit, the information processing unit, the control unit and the operation unit are sequentially connected. The information collection unit comprises an information automatic collection module and a communication module, wherein the information automatic collection module is connected with a computer DCS system of the operation unit through the communication unit. The information processing unit comprises a data calculation module, a data comparison module and a data analysis module. The control unit comprises a factory-level scheduling command system module, a production plan cost check module, an equipment energy consumption economical efficiency diagnosis module and an equipment state diagnosis module. The system can find hidden or exposed various problems, which affect the high-efficiency utilization of energy sources, at the links of enterprise resource production, conveying, transfer, distribution and consumption in a thermodynamic system, can carry out the diagnosis and analysis of the problems and provides processing suggestions.
Owner:BENGANG STEEL PLATES

Power equipment maintenance system and method based on artificial intelligence

The invention discloses a power equipment maintenance system and method based on artificial intelligence, and belongs to the field of deep learning. The method comprises the steps of collecting the material of the power equipment, calculating the fault rate of the power equipment, carrying out initial scoring on the power equipment according to the fault rate of the power equipment, outputting a power equipment evaluation value, evaluating the operation state of the power equipment, and evaluating the operation state of the power equipment according to the power equipment evaluation value and the operation environment of the power equipment. Adjusting the maintenance cycle of the power equipment according to the operation state of the power equipment; according to the method, the operation state of the power equipment is evaluated from two aspects of the probability of possible faults of the power equipment and the influence of the operation environment of the power equipment on the power equipment, the maintenance period of the power equipment is adjusted according to the operation state of the power equipment, and the maintenance period is reasonably configured; the method can timely check the power equipment which is liable to have fault hidden troubles, nip in the bud, avoid overhauls and blind maintenance, and reasonably distribute maintenance resources.
Owner:江苏贺鸿电子有限公司

Using method for sand aeration type safety joint under petroleum well

ActiveCN107642341ASolve the problem of sand burialPrevent overhaulDrilling rodsVibration devicesUpper jointType safety
The invention relates to a using method for a sand aeration type safety joint under a petroleum well. According to the technical scheme, the safety joint comprises an upper joint and a lower joint, the lower joint is connected to the lower portion of the upper joint, the outer side of the upper joint is sleeved with a sealing steel bush, a shear ring is arranged between the sealed steel bush and the upper portion of the upper joint, a safety shear pin is arranged on the upper portion of the shear ring, a sealing piston is arranged between the sealing steel bush and the lower portion of the upper joint, and connected with the lower portion of the upper joint through a left-hand thread, an impact cavity is formed between the shear ring and the sealing piston, and a sand aeration hole is formed in the lower portion of the sealing steel bush. The using method has the advantages that the problem of sand blocking can be solved, a tubular pile can be safely lifted out, heavy repair can be avoided for the petroleum well, a sand-prevention tube can be directly pulled out under variable conditions, the problem that under most conditions, the sand-prevention tube is taken out in a segmented mode is solved, operation is easy, and time and labor are saved.
Owner:西安嘉和瑞诚实业有限公司

Sand-loosening type petroleum downhole safety connector

ActiveCN107558933ASolve the problem of sand burialPrevent overhaulDrilling rodsVibration devicesPetroleumOil well
The invention relates to a sand-loosening type petroleum downhole safety connector. According to the technical scheme, the sand-loosening type petroleum downhole safety connector comprises an upper connector and a lower connector, the lower connector is connected on the lower portion of the upper connector, and the outer side of the upper connector is sleeved with a sealing steel sleeve; a shearing ring is arranged between the upper portions of the sealing steel sleeve and the upper connector, a safety shearing nail is arranged on the upper portion of the shearing ring, and a sealing piston isarranged between the lower portions of the sealing steel sleeve and the upper connector; and the lower portions of the sealing piston and the upper connector are connected through a reversed buckle,an impact cavity is formed between the shearing ring and the sealing piston, and a sand-loosening hole is formed in the lower portion of the sealing steel sleeve. The sand-loosening type petroleum downhole safety connector has the beneficial effects that sand jam is solved, a pipe column can be safely pulled out, oil well overhauling is prevented, a sand control pipe can be directly pulled out invarious situations, the problem that most sand control pipes are taken out in sections at present is solved, operation is simple, and time saving and labor saving are achieved.
Owner:东营市科创石油装备有限公司

Maintenance decision-making method based on power generation equipment operation state comprehensive evaluation model

The invention discloses a maintenance decision-making method based on a power generation equipment operation state comprehensive evaluation model. Power generation equipment status is included, wherein the power generation equipment status comprises n mutually independent characteristic quantity values x1(t), x2(t),..., xn(t)representing the power generation equipment status respectively; x1(t), x2(t),..., xn(t) come from the same object, so that the x1(t), x2(t),..., xn(t) are considered as a whole to form an m-dimensional vector which is called as a status feature vector of the equipment, and an n-dimensional space formed by all possible values of the state feature vector x at the moment t is called as a state feature space. The invention discloses a maintenance decision-making method based on a power generation equipment operation state comprehensive evaluation model. The deterioration degree of comprehensive characteristic parameters representing the equipment status is used for representing the health condition of the equipment, the comprehensive characteristic parameters comprise vibration time threshold signal characteristics, vibration frequency spectrum characteristics andvibration change trend characteristics, and the accuracy of describing the health condition of the equipment can be effectively improved through the method.
Owner:HUADIAN ZOUXIAN POWER GENERATION CO LTD

DP-MPSO algorithm based weekly repair plan compiling and optimizing method for power dispatching

The invention provides a DP-MPSO algorithm based weekly repair plan compiling and optimizing method for power dispatching, which is characterized by and comprises the following steps: simplifying a power grid equipment repair model into a power charging and loading two-end model; performing a constraint processing to the power grid equipment repair model; breaking down and transforming the problem of repair plan compiling into the problem of an optimized combining of single day superposed load and the installed capacity balance across the power grid; formulating a peak value optimizing and sequencing strategy; converting into a 0 / 1 knapsack problem and through the DP-MPSO algorithm, obtaining the most optimized solution to the peak value; dating back all optimized results of the peak value; inspecting a cross-work period repair ticket optimized set and determining if the acceptance or rejection results of one single cross-work period repair ticket are consistent or not in different work periods. With the method provided by the invention, the goals of repair compiling are concentrated and refined. Being intelligent and high efficient, the plan compiling is added by a DP-MPSO algorithm in the optimization process with the consequence of an improved calculating efficiency.
Owner:STATE GRID CORP OF CHINA +3

Sealing device of casing pipe suspension device

InactiveCN106089142ATo achieve the purpose of space sealingTo achieve the purpose of sealingSealing/packingEngineeringUltimate tensile strength
The invention discloses a sealing device of a casing pipe suspension device. The sealing device is arranged between a casing pipe head and a casing pipe body and located above the casing pipe suspension device. The sealing device comprises an annular fixing piece (1). An outer sealing ring (2) is arranged on the outer wall of the annular fixing piece in a sleeving mode, and the outer wall of the annular fixing piece makes contact with the outer wall of the casing pipe head through the outer sealing ring (2). An inner sealing ring (3) is arranged on the inner wall of the annular fixing piece, and the inner wall of the annular fixing piece makes contact with the inner wall of the casing pipe body through the inner sealing ring (3). Sealing of the casing pipe body and the casing pipe head is achieved through the inner sealing ring and the outer sealing ring of the annular fixing piece. By means of the sealing device of the casing pipe suspension device, the purpose that the upper space of the suspension device is sealed can be achieved, and the effect that a flange primary seal passes the pressure test during later operation is ensured; and the well-killing operation and wellhead flame operation links are reduced, the labor intensity is relieved, the labor cost is reduced, the production limitation period is prolonged, and the safety coefficient is increased.
Owner:CHINA PETROLEUM & CHEM CORP

Auxiliary overhauling method, overhauling device and overhauling system for railway vehicle

The invention provides an auxiliary overhauling method, an auxiliary overhauling device and an auxiliary overhauling system for a railway vehicle, and relates to the technical field of vehicle overhauling. The rail vehicle is provided with a detection system, and the detection system is used for detecting a plurality of components and outputting state parameters of all the components. The maintenance method comprises the steps: acquiring the state parameters of at least one component; searching an overhaul model corresponding to the state parameter from a preset database according to the stateparameter; obtaining maintenance parameters according to the state parameters and the maintenance model; when the maintenance parameter reaches a threshold value, sending a maintenance prompt signaland maintenance condition information; detecting the maintenance stations meeting the maintenance condition information, and sending a maintenance prompt signal and relative position information of the maintenance stations and the vehicle to the detection system. According to the auxiliary overhauling method, the auxiliary overhauling device and the auxiliary overhauling system of the railway vehicle, the overhauling resources can be saved, and the overhauling process is accelerated.
Owner:DATONG ELECTRIC LOCOMOTIVE OF NCR

Small unsealing force packer

PendingCN110439501APrevent setting effectsPrevent overhaulSealing/packingPistonEngineering
The invention relates to a small unsealing force packer. The small unsealing force packer comprises an upper joint, a central pipe, an upper outer pipe, a lower outer pipe, a well flushing piston seat, an upper piston, a well flushing piston sleeve, a rubber cylinder assembly, and a short joint, and the small unsealing force packer is characterized in that a one-way exhaust valve is assembled between an exhaust hole of a pressure bearing joint and the lower outer pipe, a setting piston is installed on the lower outer pipe, fixed by a setting shear pin, and unsealed to sleeve a circlip hook andlocked to a circlip hook body, an unsealed shear pin is screwed on the circlip hook for fixation, and a circlip is installed on the circlip hook. The lower part of a lower joint is connected with theshort joint by a forced unsealed shear pin, and the outer side of the lower part of the lower joint is provided with a sheath which is fixed by a sheath pin. According to the small unsealing force packer, a forced unsealing structure is arranged at the lower short joint portion; and the unsealed shear pin does not bear the rebound force of the rubber cylinder, the size of the unsealed shear pin is reduced, the strength of the unsealed shear pin is reduced, and the packer can be unsealed with very low unsealing force. After being set, the packer can be locked in one way to ensure that the packer is set tightly and reliably.
Owner:LIAONING XINHUA INSTR CO LTD

Reinforcement and energy-dissipating vibration-absorbing device for mortise and tenon joints of wooden structures

The invention discloses a device for reinforcement, energy dissipation and seismic mitigation of a tenon and mortise joint of a timber structure. The device for reinforcement, energy dissipation and seismic mitigation of the tenon and mortise joint of the timber structure comprises a wood beam, a wood pole, the tenon and mortise joint, embedded steel bars, joint connecting pieces and joint fastening pieces, wherein the wood beam is connected with the wood pole through the tenon and mortise joint, conduits are formed in the upper end surface and the lower end surface of the wood beam or in the two lateral surfaces of the wood beam respectively, the embedded steel bars are embedded in the conduits in advance, the conduits are sealed through small battens and special structural adhesive, one end of each joint connecting piece is connected with a corresponding embedded steel bar, the other end of each joint connecting piece is connected with a corresponding joint fastening piece, and the joint fastening pieces penetrate through the pole body of the wood pole and are fixed on the side, back on to the wood beam, of the wood pole through anchor plates and cushion blocks. The device for reinforcement, energy dissipation and seismic mitigation of the tenon and mortise joint of the timber structure is high in bending resistance, energy-dissipation capacity and ductility, and capable of guaranteeing stability of the structure under the small earthquake condition, achieving serious deformation under the large earthquake condition to control structural damage, and achieving automatic restoration of the structure after an earthquake.
Owner:NANJING TECH UNIV

A Method for Evaluating Construction Effect of Measure Operation in Downhole Workover Operation

The invention discloses a method for evaluating construction effects of measure operations in downhole workover operations: (a) determining the evaluation index set U of measure operations; determining the evaluation set V of operation effects; determining the weight W of each evaluation index; giving the evaluation Matrix R=(R 1 , R 2 , R 3 , R 4 , R 5 , R 6 T ), R i =(r i1 ,r i2 ,r i3 ,r i4 ,r i5 ); establish a fuzzy evaluation model; calculate the evaluation index value B and normalize it; obtain the comprehensive evaluation result according to the principle of maximum membership. The purpose of the present invention is to provide a method for evaluating the construction effect of measure operations in downhole workover operations, so as to solve the above-mentioned defects in the evaluation methods for measure downhole operations in the prior art, improve the quality of workover operations, and prolong the maintenance-free period of oil and water wells. In order to keep abreast of the effects of workover operations and their influencing factors in a timely manner, the purpose of improving the quality of workover operations is to avoid unnecessary overhaul and complex operations as much as possible.
Owner:SOUTHWEST PETROLEUM UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products