A dual-function chlorine dioxide preparation device and chlorine dioxide preparation method
A chlorine dioxide, dual-function technology, which is applied in the field of chlorine dioxide preparation and dual-function chlorine dioxide preparation devices, can solve problems such as affecting product quality, high power consumption, and equipment waste.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Such as figure 1 As shown, the device for preparing chlorine dioxide with dual functions of the present invention includes a heater 1 and a reactor 5 connected by an overflow pipe 3, an electromagnetic induction heater 2 is arranged outside the heater 1, and an electromagnetic induction heater 2 is arranged outside the reactor 5. There is a constant temperature heating belt 4.
[0028] The heater 1 is a tubular container made of stainless steel, and the reactor 5 is a PVC tubular reactor. The heater 1 is connected to the first material delivery pipeline 11, the reactor 5 is connected to the second material delivery pipeline 6, the aeration pipe 7 and the exhaust pipe 8 respectively, and the heater 1 and the reactor 5 are connected to the pressure relief pipe 9 respectively A transverse baffle 10 is arranged on the upper part of the interior of the reactor 5, and an acute angle is arranged between the second material conveying pipeline 6 and the aeration pipe 7 .
Embodiment 2
[0030] On the basis of Embodiment 1, the following features are also included:
[0031] One end of the overflow pipe 3 is connected to the upper part of the heater 1, the other end is connected to the lower part of the reactor 5, the second material delivery pipeline 6 and the aeration tube 7 are connected to the lower part of the reactor 5, and the first material delivery pipeline 11 is connected to the lower part of the heater 1, the pressure relief pipe 9 is respectively connected to the upper part of the heater 1 and the reactor 5, and the exhaust pipe 8 is connected to the upper part of the reactor 5; the electromagnetic induction heater 2 is closely arranged in the middle of the heater 1 , The constant temperature heating belt 4 is closely arranged in the middle of the reactor 5 .
Embodiment 3
[0033] On the basis of embodiment 2, it also includes the following features: the first material delivery pipeline 11 is a sodium chlorate solution delivery pipeline, and the second material delivery pipeline 6 is a hydrochloric acid solution delivery pipeline.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
