301 precision strip steel production process for cylinder gasket
A production process and cylinder head gasket technology, applied in the field of steel rolling and stainless steel rolling
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] 1. Material selection: 301 cold-rolled stainless steel coils with a thickness of 0.7mm and a width of 640mm are selected as raw materials, and the thickness of the finished steel strip after cold rolling is 0.2mm.
[0033] 2. Preliminary rolling: The raw material of stainless steel cold-rolled coils with a thickness of 0.7mm is rolled by SUNDWIG four-column twenty-high rolling mill. During rolling, BP rolling oil is used for lubrication and cooling. The temperature of the rolling oil is 40°C. The method of multi-pass and small reduction ratio, cold rolling to 0.375mm after 3 passes, in which the surface roughness Ra of the work roll is 0.25μm, the rolling speed of the first pass is 80m / min, and the second pass is The rolling speed of the middle pass is 300m / min, and the rolling speed of the third pass, that is, the finished pass, is 200m / min.
[0034] 3. Solution treatment: The steel coil after initial rolling passes through a vertical continuous bright annealing furnac...
Embodiment 2
[0042] 1. Material selection: 301 cold-rolled stainless steel coils with a thickness of 0.7mm and a width of 640mm are selected as raw materials, and the thickness of the finished steel strip after cold rolling is 0.25mm.
[0043] 2. Preliminary rolling: The raw material of stainless steel cold-rolled coils with a thickness of 0.7mm is rolled by SUNDWIG four-column twenty-high rolling mill. During rolling, BP rolling oil is used for lubrication and cooling. The temperature of the rolling oil is 40°C. The method of multi-pass and small reduction rate, after 3 passes of cold rolling to 0.425mm, the surface roughness Ra of the work roll is 0.25μm, the rolling speed of the first pass is 80m / min, and the second pass is The rolling speed of the middle pass is 300m / min, and the rolling speed of the third pass, that is, the finished pass, is 200m / min.
[0044] 3. Solution treatment: The steel coil after initial rolling passes through a vertical continuous bright annealing furnace with...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| Vickers hardness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 