Joint reinforced type fabricated steel pipe concrete connecting structure and construction method thereof

A technology for concrete-filled steel tubes and connecting structures, which is applied in building structures, buildings, etc., can solve the problems of steel tube bending bearing capacity and mechanical performance, reinforcement of steel tubes at nodes, and inability to work together, so as to achieve mechanical performance and integrity. Good, fast and reliable connection, good construction quality

Pending Publication Date: 2019-02-15
FUJIAN UNIV OF TECH
View PDF10 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In traditional concrete-filled steel tube multi-story buildings, each section of steel pipe hoisted on site can generally reach more than ten meters. When the cross-section of the steel pipe is larger, its own weight is greater, and the hoisting requirements for hoisting machinery are relatively high; In most places, on-site welding is used. This connection method has open flame operations on site, and the construction quality is difficult to guarantee.
[0003] The commonly used method for CFST joints is the externally reinforced ring plate. During construction, the externally reinforced ring plate and steel beams are usually welded in advance in the entire steel pipe. During the stress process of this kind of joint, the steel pipe may buckle at the joint, which makes the bearing capacity and The mechanical performance is reduced, so that the goal of strong joints and weak members cannot be achieved, so it is necessary to find a way to locally strengthen the joints
However, since the steel pipe at the joint is long, it is difficult to locally strengthen the steel pipe at the joint
If the method of thickening the re-welded steel pipe is adopted, the thickened steel pipe under the load will easily create a gap with the original node steel pipe and cannot work together
In addition, it is difficult to achieve variable cross-sectional size or cross-sectional form in the column length for long steel pipe columns

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Joint reinforced type fabricated steel pipe concrete connecting structure and construction method thereof
  • Joint reinforced type fabricated steel pipe concrete connecting structure and construction method thereof
  • Joint reinforced type fabricated steel pipe concrete connecting structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

[0026] like Figure 1~3 As shown, a node-reinforced assembled steel pipe concrete connection structure of the present invention includes an upper steel pipe column 1, a lower steel pipe column 6, and a node connector 2 for connecting the upper steel pipe column 1 and the lower steel pipe column 6 through bolts. The upper and lower ends of the connector 2 extend into the interior of the upper steel pipe column 1 and the lower steel pipe column 6 respectively, and the interior of the node connector 2 is provided with a through hole vertically penetrating and used to connect the upper steel pipe column and the lower steel pipe column 7. The upper steel pipe column 1 , the lower steel pipe column 6 and the through hole 7 are all filled with concrete 3 .

[0027] In this embodiment, the upper steel pipe column 1 and the lower steel pipe c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a joint reinforced type fabricated steel pipe concrete connecting structure and a construction method thereof. The joint reinforced type fabricated steel pipe concrete connecting structure comprises an upper steel pipe column, a lower steel pipe column and a joint connecting piece used for connecting the upper steel pipe column and the lower steel pipe column through bolts, wherein the upper and lower ends of the joint connecting piece separately extend into the inner parts of the upper steel pipe column and the lower steel pipe column; through holes penetrating vertically and used for connecting the upper steel pipe column and the lower steel pipe column in a communicating mode are arranged in the joint connecting piece; and the upper steel pipe column, the lowersteel pipe column and the through holes are filled with concrete. The joint reinforced type fabricated steel pipe concrete connecting structure has simple and reasonable structure, low hoisting requirement, no welding operation on site, fast and reliable connection, convenient construction and good construction quality; and meanwhile, steel pipes at the joint can achieve locally reinforcing, the columns can be easily changed into section, and the stress performance and integrity are good.

Description

Technical field: [0001] The invention belongs to the technical field of steel and concrete combined structures in civil engineering, and in particular relates to a node-reinforced assembled steel pipe concrete connection structure and a construction method thereof. Background technique: [0002] In traditional concrete-filled steel tube multi-story buildings, each section of steel pipe hoisted on site can generally reach more than ten meters. When the cross-section of the steel pipe is larger, its own weight is greater, and the hoisting requirements for hoisting machinery are relatively high; In most places, on-site welding is used. This connection method has open flame operations on site, and the construction quality is difficult to guarantee. [0003] The commonly used method for CFST joints is the externally reinforced ring plate. During construction, the externally reinforced ring plate and steel beams are usually welded in advance in the entire steel pipe. During the st...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/58E04B1/30
CPCE04B1/185E04B1/30
Inventor 郑永乾曾少昔黄玉宁赵剑
Owner FUJIAN UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products