Construction method for pore forming in artificial rockfill layer

A construction method and hole-forming technology, applied in excavation, foundation structure engineering, sheet pile walls, etc., to ensure normal progress, reduce construction operation costs, and improve construction operation efficiency

Active Publication Date: 2019-02-26
SHANGHAI BAOYE GRP CORP
View PDF2 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The technical problem to be solved by the present invention is to provide a construction method for forming holes in the artificial rock-fill layer. This method solves the problem of hole-forming construction of cast-in-place piles in the rock-fill layer, and ensures the normal progress of construction operations. Reduce construction operation cost and improve construction operation efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The construction method of the present invention forming hole in the artificial stone filling layer comprises the steps:

[0018] Step 1. Shallow block stone removal. According to the distribution of block stone layers in the construction site, the pile position to be constructed is set out to determine the pile position. At the pile position, use an excavator to screen and remove particles within 6m and with a particle size greater than 20cm. Block stones, after the block stones are removed, backfill the cohesive soil without block stones and lay steel plates after compaction;

[0019] Step 2. Embed a casing made of steel plates at the pile position. The depth of the casing should not be less than 1.5m. The top surface of the casing is 300mm above the ground, and the center of the casing coincides with the center of the pile location;

[0020] Step 3. For the stone filling layer with a diameter of 20-100cm and a layer thickness of less than 4m, use a rotary drilling ri...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Particle sizeaaaaaaaaaa
Diameteraaaaaaaaaa
Layer thicknessaaaaaaaaaa
Login to View More

Abstract

The invention discloses a construction method for pore forming in an artificial rockfill layer. The construction method includes the steps that superficial-layer dimension stones are screened and removed through an excavator at a position of a pile position, cohesive soil is backfilled and compacted, and then steel plates are laid; a protection cylinder is embedded, and the center of the protection cylinder is coincided with the center of the pile position; according to the diameter of the dimension stones and the layer thickness of the rockfill layer, a rotary drilling rig and a punching drilling rig are used and are positioned on the laid steel plates for conducting pore-forming construction, and meanwhile slurry with the certain relative density is prepared for grouting pore forming; after pore forming, the pore depth is measured and inspected through a measuring line, and after verification, pores are cleaned. By means of the construction method for pore forming in the artificial rockfill layer, the aim that pore forming construction of the cast-in-place pile is conducted is achieved, normal operating of construction operation is guaranteed, the cost of the construction operation is reduced, and the efficiency of the construction operation is improved.

Description

technical field [0001] The invention relates to a construction method for forming holes in an artificial rock filling layer. Background technique [0002] With the rapid development of urban construction, coastal cities continue to carry out large-scale land reclamation. Most of the original land reclamation sites belong to coastal tidal landforms. The artificial landfill materials are mainly composed of granite blocks, and the diameter of the blocks is generally 20-80cm. , with a maximum diameter of more than 1m, filled with gravel, breccia and cohesive soil, and the layer thickness is uneven. When carrying out the construction of deep foundation pit support piles in the reclamation area, it is often encountered that the rock filling layer is difficult to pass through, and the hole is difficult to form, which brings troubles to the support pile construction and affects the normal construction of the building. , Increase the cost of construction operations and reduce the ef...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D5/38E02D5/60E02D17/04
CPCE02D5/38E02D5/60E02D17/04
Inventor 姚喜民
Owner SHANGHAI BAOYE GRP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products