A Dynamic Design Method of Tunnel Initial Support Based on Deformation-Structure Method
A technology of initial support and dynamic design, which is applied in the dynamic design of railway and highway tunnel construction stages, and in the field of highway tunnel construction engineering design, can solve problems such as poor economy, and achieve good timeliness and economy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0048] A 350km / h high-speed railway tunnel under construction has an excavation height of 12.78m and an excavation span of 15.2m. The tunnel is a deep buried tunnel, and the surrounding rock condition is Class IV. The initial support is a reinforced concrete structure, using C30 shotcrete and HRB400 steel bars, with a thickness of 0.25m. Surrounding rock and building material parameters are selected according to "Tunnel Regulations". First provide the concrete flow chart of embodiment, see figure 1 , including the following steps:
[0049] (1) Establish the physical model of the surrounding rock and the primary support structure of the tunnel: the beam-spring model. Such as figure 2 shown, including the following steps:
[0050] 1) The primary support is discretized into 44 elastic beam elements with a unit length of 1.0m, and the element stiffness matrix in the local coordinate system is [k′ 1 ] 6×6 , the element stiffness matrix in the global coordinate system is [k ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com