A construction method and construction device for a tbm device passing through a vertical shaft
A realization method and technology for shafts, which are used in shaft equipment, earthwork drilling, wellbore lining, etc., can solve problems such as insufficient support force, and achieve the effect of shortening construction period and high construction efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] Preferred embodiments of the present invention are described in detail below.
[0029] A construction realization method and construction device for a TBM device passing through a vertical shaft provided by the present invention, its preferred embodiment is as follows figure 1 As shown, it is a schematic diagram from the perspective of the construction direction of the TBM head. After the front face of the TBM head 110 enters the shaft 120, the head has little bearing capacity. According to the length of the shaft, the TBM head 110 will eventually touch the direction of progress. on the sidewall and continue with the excavation. figure 1 The middle shaft 120 is for illustration only. According to the original construction method of the prior art, after the TBM machine head enters the other side wall of the shaft, the bottom plate of the shaft needs to be filled with pea gravel and concrete slurry according to the traditional filling process, but due to the large space ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 