Construction method of water plank road structure

A construction method and plank road technology, applied in construction, bridge construction, bridges, etc., can solve problems such as river pollution and poor safety, and achieve the effects of avoiding pollution, saving construction time, and reducing steel bar binding

Active Publication Date: 2020-09-08
SHANGHAI CONSTR NO 5 GRP CO LTD
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

If double rows of steel pipe piles are used as the cofferdam, although the cost is low, the filling will easily pollute the river
At the same time, during the construction of the cofferdam, it is necessary to pay attention to the safety of the cofferdam at all times to avoid water leakage of the cofferdam, and emergency measures must be taken to prevent the cofferdam from collapsing, which is poor in safety.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of water plank road structure
  • Construction method of water plank road structure
  • Construction method of water plank road structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments. The technical content and features of the present invention will be described in detail below by referring to the illustrated embodiments in conjunction with the accompanying drawings. It should be further noted that all the drawings are in very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention. For the convenience of description, the "up" and "down" described below are consistent with the directions of up and down in the drawings, but this should not be a limitation of the technical solution of the present invention.

[0041] see Figure 2 to Figure 4 , the invention discloses a construction method for a water plank road structure, comprising the following steps:

[0042] Step 1, construction lofting, after the pile test, c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Aiming at the problems of long construction period and serious environmental pollution caused by the construction of a cofferdam in the construction of an overwater plank road structure in the prior art, the invention provides a construction method of the overwater plank road structure, which comprises a plurality of prefabricated piles, a longitudinal and transverse combined distribution beam, acorrugated plate, a concrete plate and a handrail. The longitudinal and transverse combined distribution beams are arranged above the prefabricated piles, the corrugated plates are arranged above thelongitudinal and transverse combined distribution beams, the concrete plates are arranged above the corrugated plates, the handrails are arranged at two sides of the concrete plates, the longitudinaland transverse combined distribution beams comprise a plurality of transverse steel beams and a plurality of longitudinal steel beams, the transverse steel beams are respectively arranged on at leasttwo prefabricated piles, the transverse steel beams are arranged in parallel, two ends of adjacent transverse steel beams are respectively connected through corresponding longitudinal steel beams, andthe longitudinal steel beams are flush with the upper surface of the transverse steel beams. According to the construction method of the overwater pallet structure provided by the invention, the construction progress can be accelerated, and meanwhile, the pollution of cofferdam construction to rivers can be avoided.

Description

technical field [0001] The invention relates to the field of building construction, in particular to a construction method for a water plank road structure. Background technique [0002] The existing water plank road structure adopts an integral cast-in-place structure, such as figure 1 As shown, the concrete base plate 12 is poured above the friction pile 11, and the concrete column 13 is arranged on the concrete base plate 12. The vertical and horizontal combination distribution beam is arranged on the concrete column 13. A concrete slab is placed on the beam 2'. [0003] On the one hand, due to the construction of the concrete foundation slab and the setting of concrete columns on the concrete foundation slab, a large number of steel bar binding, formwork installation, concrete pouring and other processes are required, requiring a lot of manpower and material resources, and the concrete foundation slab and concrete columns need to be maintained for 28 days. very long. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00E01D15/12E01D19/00E01D19/02E01D19/12E01D19/10
CPCE01D15/12E01D19/005E01D21/00
Inventor 李涛毛子成熊玎玮张丽骏王可东