A method and a system for real-time updating of supervisory field management and control project progress

A real-time update and project progress technology, applied in the field of project management, can solve problems such as failure to achieve common supervision, inability to achieve quantitative supervision and management, and inconvenience in sharing project construction information, and achieve the effect of ensuring construction quality.

Inactive Publication Date: 2019-05-03
GUANGZHOU TIANYUE ELECTRONICS TECH
View PDF3 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] First, the work consumes a lot of human resources, all the data are collected manually, and the relevant books are stored in paper or computer files, which is extremely inconvenient to query;
[0004] The second is that the management is not refined, it is impossible to achieve real-time quantitative supervision and management, and it is impossible to manage multiple engineering projects at the same time on a large scale;
[0005] The third is that it is not convenient for later inspection and spot check. When saving project materials, they are usually paper or electronic documents, some files and pictures, and it is impossible to query the project progress by project, progress or date;
[0006] Fourth, it is not convenient for real-time supervision. When querying documents, specific places and users are generally limited, which is not convenient for information sharing of engineering construction, and the purpose of joint supervision cannot be achieved.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method and a system for real-time updating of supervisory field management and control project progress
  • A method and a system for real-time updating of supervisory field management and control project progress
  • A method and a system for real-time updating of supervisory field management and control project progress

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0066] Various exemplary embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It should be noted that the relative arrangements of components and steps, numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present invention unless specifically stated otherwise.

[0067] Techniques, methods and devices known to those of ordinary skill in the relevant art may not be discussed in detail, but where appropriate, such techniques, methods and devices should be considered part of the description.

[0068] figure 1 It is a schematic structural diagram of an embodiment of the method for real-time updating of the progress of the supervision site management and control project of the present invention, as figure 1 As shown, the system for real-time updating of the progress of the supervision site management and control project includes:

[0069] Unit project module, project ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention discloses a method and system for updating the progress of a supervised field management and control project in real time, and the method comprises the steps: setting aproject directory, splitting a project according to the project progress and a project construction process, and recording the project construction progress condition; according to the engineering construction progress, the engineering construction progress is modified, and an engineering construction log is added; Adding engineering construction parameter information into the engineering construction log, uploading the engineering construction parameter information to a server, and recording the current construction condition of the engineering project by the server; and the server records the engineering construction parameters in a corresponding engineering project directory, updates the storage information in real time, and records the update time of the engineering project. Accordingto the method, the overall quality is guaranteed through process decomposition and detail quality grasping of unit engineering, systematic monitoring of all processes of on-site construction is achieved, it is guaranteed that the engineering quality is subjected to closed-loop management, and the construction quality is guaranteed.

Description

technical field [0001] The invention relates to the technical field of project management, in particular to a method and system for real-time updating of project progress on site for supervision. Background technique [0002] In the field of engineering construction technology, fine management of construction is the most fundamental way to improve construction quality. In the existing technology, the method of project management is generally manual, or the work schedule is formulated, and the project is supervised by manual supervision. progress, or use manual on-site supervision and measurement to check the quality of the project, or collect project work samples to check whether the project work indicators meet the relevant national standards. These methods have at least the following problems: [0003] First, the work consumes a lot of human resources, and all the data rely on manual collection, and the relevant books are stored in paper or computer files, which is extreme...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
Inventor 田野
Owner GUANGZHOU TIANYUE ELECTRONICS TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products