Water drainage structure of municipal road and construction method thereof
A technology for drainage structures and municipal roads, applied to drainage structures, roads, roads, etc., can solve problems such as reduced drainage capacity, poor drainage on the road surface, blockage of drainage pipes, etc., to reduce obstruction, speed up drainage, and prevent road surface The effect of standing water
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Such as figure 1 , 2 As shown, a drainage structure of a municipal road includes a road body 1 and a drainage pipe 2 arranged in the road body 1. The drainage pipe 2 is buried in the sidewalk 12 along the length direction of the sidewalk 12. The road body 1 includes a lane 11 and a sidewalk 12 , sidewalk 12 is arranged higher than driveway 11, and driveway 11 is provided with drainage well 3 near the side of sidewalk 12, and the wellhead place of drainage well 3 is provided with rainwater grate 31.
[0044] Such as figure 2 As shown, the sidewalk 12 is provided with a collection well 4 along the vertical direction, and the drainage well 3 is communicated with the collection well 4 through the first connecting pipe 51, and the collection well 4 is communicated with the drain pipe 2 through the second connecting pipe 52. The cross-sectional area is larger than that of the first connecting pipe 51 and the second connecting pipe 52 so as to accommodate more garbage and l...
Embodiment 2
[0053] A construction method for a drainage structure of a municipal road, comprising the following steps:
[0054] Step 1, construction of the drainage well 3, during construction, excavate the earthwork from top to bottom, excavate the drainage well 3 vertically, and excavate the trench horizontally;
[0055] Step 2, construction of the collection well 4, excavating a cylindrical hole in the vertical direction at the approximate middle of the trench, and the excavation depth is not less than the depth of the drainage well 3;
[0056] Step 3, install the first connecting pipe 51 and the second connecting pipe 52, hoist the first connecting pipe 51 and the second connecting pipe 52 into the groove, make the first connecting pipe 51 communicate with the drainage well 3 and the collection well 4, Before the second connecting pipe 52 is installed, the filter screen 521 is installed on the end where the second connecting pipe 52 is connected with the collection well 4;
[0057] S...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com