Composite hydrodynamic reservoir bank slope stability prediction method
A technology of stability prediction and hydrodynamics, which can be used in instrumentation, calculation, electrical and digital data processing, etc., and can solve problems such as misjudgment of landslide stability.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0079] Such as Figure 1 to Figure 6 As shown, the method for predicting the bank slope stability of the composite hydropower bank described in the present invention has the following steps:
[0080] Step 1: Preliminary investigation and selection of displacement monitoring points for reservoir-type landslides
[0081] Preliminary investigation and surveying of the reservoir-type landslide to be evaluated are carried out to determine the distribution range and size of the landslide, so as to select a reasonable layout method for the slope displacement monitoring point 02: ①according to the reservoir water level scheduling plan, the highest reservoir water level touches the slope from 01 to Set n displacement monitoring points (n ≥ 3) within the range of tension crack 03 at the trailing edge; ② The displacement monitoring reference points (not less than 3) are selected in the stable bedrock or non-deformed area outside the monitored landslide mass to form a displacement The mo...
Embodiment 2
[0193] The following takes a reservoir-type composite water landslide as an example to describe in detail. The landslide is a landslide of accumulative layer along the Yangtze River, which is a typical reservoir-type landslide. The water level of the reservoir drops from May to September every year. The monitoring time of this example is from May to September 2012.
[0194] Such as figure 1 As shown, the method for predicting the bank slope stability of the composite hydropower bank described in the present invention, the specific implementation steps are as follows:
[0195] Step 1: Preliminary investigation and selection of displacement monitoring points for reservoir-type landslides
[0196] Carry out preliminary investigation and mapping of the reservoir-type landslide to be evaluated, determine the distribution range and size of the landslide, and then choose a reasonable layout method for slope displacement monitoring points: ①According to the reservoir water level sche...
PUM
Property | Measurement | Unit |
---|---|---|
Permeability coefficient | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com