Preparation method of SBS modified asphalt
A technology of modified asphalt and asphalt, which is applied in building components, building insulation materials, buildings, etc., can solve problems such as changes in service performance and product index attenuation, and achieve high production efficiency, superior high and low temperature performance, and improved utilization.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Example 1: Select Karamay 90# asphalt and Tahe Petrochemical 60# asphalt for compound test,
[0027] 1. Choose four blending ratios
[0028] Asphalt material Scale 1 Scale 2 Scale 3 Scale 4 Tahe Petrochemical 60# Asphalt50%60%70%80% 克拉玛依90# Asphalt 50%40%30%20%
[0029] 2. Carry out production test on the asphalt with the above four blending ratios, and the characteristics of the modified asphalt obtained are shown in the following table:
[0030]
[0031]
[0032] Through the above production test, the combination ratio of Karamay 90# asphalt and Tahe Petrochemical 60# asphalt is selected to be 30%-40%: 60%-70%;
[0033] 3. Perform on-site verification production through two production processes: mother liquor method and conventional grinding method:
[0034] Table 1
[0035]
[0036] Through the simultaneous sampling data comparison of the tank body at the start of the vehicle, the 48h project test data comparison, eliminating the influence of instrument deviation and manua...
Embodiment 2
[0042] Embodiment 2: It mainly includes the following steps:
[0043] (1) Raw material processing: select Karamay 90# asphalt and Tahe Petrochemical 60# asphalt and heat them to 150°C respectively, and mix according to the weight percentage of 30%:70%, and stir and mix for 3 hours at a temperature of 157°C. The stirring speed is 55 revolutions / min.
[0044] (2) Add co-solvent: After step 1 is completed, add co-solvent, the co-solvent is the reduced second and third-line anti-oxidation asphalt solubilizing extender, and stir and mix uniformly, the added amount of the co-solvent It is 12% of the finished product, and the temperature of the co-solvent is 50°C.
[0045] (3) Adding modifier: After mixing uniformly in step 2 above, the mixed liquid is instantly heated to 185℃ through a heat exchanger and then sent to the pre-mixing tank, and SBS is continuously fed through automatic weighing and screw feeder The modifier is put into the pre-mixing tank, and high-speed stirring is perform...
Embodiment 3
[0050] Embodiment 3: It mainly includes the following steps:
[0051] (1) Raw material processing: select Karamay 90# asphalt and Tahe Petrochemical 60# asphalt and heat them to 151°C respectively, and mix according to the weight percentage of 31%:69%, and stir and mix at a temperature of 156°C for 4 hours. The stirring speed is 56 revolutions / min.
[0052] (2) Add co-solvent: After step 1 is completed, add co-solvent, the co-solvent is the reduced second and third-line anti-oxidation asphalt solubilizing extender, and stir and mix uniformly, the added amount of the co-solvent It is 11% of the finished product, and the temperature of the co-solvent is 45°C.
[0053] (3) Adding modifier: After mixing uniformly in step 2 above, the mixed liquid is instantly heat exchanged to 181℃ through the heat exchanger and then sent to the pre-mixing tank, and SBS is continuously fed through automatic weighing and screw feeder The modifier is put into the premix tank, and high-speed stirring is p...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


