Anti-floating construction method and structure for earth excavation of subway tunnel foundation pit with shallow earth covering at pit bottom

A technology of earthwork excavation and construction method, which is applied in the direction of foundation structure engineering, excavation, sheet pile wall, etc., can solve the problems that it is difficult to meet the floating requirements of shallow covering soil on the top of the tunnel, the construction process is complicated, and the construction efficiency is low, and the quality, safety and reliability can be achieved. According to the effect of simple construction process and clear specifications

Pending Publication Date: 2019-08-02
SHENZHEN GONGKAN GEOTECHN GRP
View PDF0 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to overcome the deficiencies in the prior art, the present invention provides an anti-floating construction method and structure for the excavation of the foundation pit of a subway tunnel with shallow overlying soil at the bottom of the pit, which solves the problem that the existing construction methods and construction structures are difficult to meet the floating requirements of the shallow overlying soil on the top of the tunnel. Low efficiency, complex construction process, high construction cost and other technical defects

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Anti-floating construction method and structure for earth excavation of subway tunnel foundation pit with shallow earth covering at pit bottom
  • Anti-floating construction method and structure for earth excavation of subway tunnel foundation pit with shallow earth covering at pit bottom
  • Anti-floating construction method and structure for earth excavation of subway tunnel foundation pit with shallow earth covering at pit bottom

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0076] The idea, specific structure and technical effects of the present invention will be clearly and completely described below in conjunction with the embodiments and accompanying drawings, so as to fully understand the purpose, features and effects of the present invention. Apparently, the described embodiments are only some of the embodiments of the present invention, rather than all of them. Based on the embodiments of the present invention, other embodiments obtained by those skilled in the art without creative efforts belong to The protection scope of the present invention. In addition, all the connection / connection relationships involved in the patent do not simply refer to the direct connection of components, but mean that a better connection structure can be formed by adding or reducing connection accessories according to specific implementation conditions. The various technical features in the invention can be combined interactively on the premise of not contradict...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an anti-floating construction method and structure for earth excavation of a subway tunnel foundation pit with shallow earth covering at the pit bottom. The construction methodcomprises the steps that a supporting structure is constructed, and supporting construction is conducted according to foundation pit supporting design requirements; uplift piles are constructed, namely a row of uplift cast-in-place piles are respectively arranged on the outer side of the safety protection line; foundation pit excavation construction is conducted, specifically, foundation pit excavation construction is conducted in a segmented excavation mode; anti-floating plate construction is conducted, specifically, anti-floating plate construction is conducted in a segmented constructionmode; the construction structure comprises uplift piles and an anti-floating plate, the uplift piles are arranged on the two sides of a tunnel in rows, the two rows of uplift piles are arranged outside safety lines on the two sides of the tunnel, and the anti-floating plate is poured at the upper ends of the uplift piles and stretches across the two rows of uplift piles; the anti-floating construction method and structure for earth excavation of a subway tunnel foundation pit with shallow earth covering at the pit bottom have the advantages of being good in anti-floating effect, simple in construction technology, high in construction efficiency, low in construction cost, environmentally friendly and the like, and the advantages which are not achieved in the prior art are achieved.

Description

technical field [0001] The invention relates to the field of building construction, in particular to an anti-floating construction method and structure for earthwork excavation of a foundation pit of an iron tunnel on shallow-covered pit bottom. Background technique [0002] Nowadays, the underground subway lines in large and medium-sized cities in China are densely distributed. In the process of urban construction, various buildings (structures) are often built on the top of subway tunnels. When excavating the underground foundation pit of buildings (structures) , along with the unloading caused by the external movement of the soil at the top of the tunnel, it will cause the change of the stress field of the original soil around the tunnel. When the pressure of the overlying soil on the tunnel is less than the generated buoyancy of the tunnel, it will inevitably cause the upward deformation of the tunnel structure. Subway operation safety poses a major threat. [0003] Usu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/02E02D17/04E02D31/12E02D19/12E02D5/38
CPCE02D5/385E02D17/02E02D17/04E02D19/12E02D31/12E02D2300/002
Inventor 邹俊峰雷斌雷帆叶坤刘治军沙桢辉
Owner SHENZHEN GONGKAN GEOTECHN GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products