Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

33results about How to "Eliminate buoyancy" patented technology

Ventilation metal filling tank

The invention relates to a ventilation metal filling tank and a method for manufacturing the same, and belongs to the field of structures of common buildings. The ventilation metal filling tank (1) comprises upper assemblies (2), lower assemblies (3) and supports (4). The upper assemblies and the lower assemblies are made of metal sheets (5), each metal sheet is divided into a face plate (7) and two side plates (8) by two bend lines (6) on the metal sheet, dense meshes (9) are formed in regions of the face plates, slurry stopping sheets (10) are formed by metal sheets punched from the meshes, two ends of each metal sheet are respectively bent by 90-degree angles along the corresponding bend lines towards the same direction to form the corresponding upper assembly and the corresponding lower assembly, each of the upper assemblies and the lower assemblies is of a U-shaped structure with three surfaces, at least three supports are embedded in each upper assembly and the corresponding lower assembly, and the upper assemblies and the lower assemblies are oppositely fastened with one another to form the ventilation metal filling tank. The ventilation metal filling tank and the method have the advantages that the ventilation metal filling tank is quite convenient to produce, transport and mount and good in mechanical property, and a hollow floor system with the ventilation metal filling tank is good in reliability, earthquake resistance and cracking resistance.
Owner:郭伍常

Bottom expanding-multisection side expanding anti-pull prestressed anchoring gravel pile and construction method

The invention discloses a bottom expanding-multisection side expanding anti-pull prestressed anchoring gravel pile and a construction method and belongs to the technical field of foundation base structures. The gravel pile comprises a side expanding gravel pile body provided with multiple side expanding sections and at least one prestressed anchor cable/rod; an anchor disc is arranged at the top of the side expanding gravel pile body, and a bottom expanding base provided with an expanded bottom is arranged at the bottom of the side expanding gravel pile body. The construction method comprises the steps that a gravel pile hole is dug, and bottom expanding and side expanding are conducted; a hardcore bed is constructed; a reinforced concrete bottom expanding base is constructed, and the anchor cable/rod is fixed in the reinforced concrete bottom expanding base; the side expanding gravel pile body is constructed; the anchor disc at the top of the pile and an anchor plate are constructed, and anchor cable/rod prestressing force is exerted. According to the bottom expanding-multisection side expanding anti-pull prestressed anchoring gravel pile and the construction method, gravel is tightly pressed in a gravel hole through the anchor cable/rod so as to form the gravel pile body, so that the bottom expanding base, the gravel pile body and the anchor disc are made into a force-bearing whole, and thus the anti-pull capacity is effectively improved; in addition, the anti-shearing and anti-slip resistance between a pile body and a soil body is increased through the side expanding gravel pile body and the bottom expanding base, the stratum applicability of a structure is improved, and the influence of underground water is reduced.
Owner:CHONGQING UNIV

Anti-floating system and construction method of sandbar sewage pipe, well

The invention discloses a sandbar sewage pipe, well anti-floating system, include anti-float plates, Bundle wire, clip rib, steel mesh, U-groove ribs, steel plate fasteners, Staples, bracing ropes, Anti-float plate are arranged at that bottom of the pipeline and bind to the pipeline through bundle wires, A loc wire rib is inserted into that inn side of the bundle wire, and a binding surface with the pipe is added. The steel bar mesh sheet is arranged below the pipe and below the sewage well. The steel bar mesh sheet is welded with U-groove reinforcement or steel plate buckle, and the U-groovereinforcement is not only welded with the mesh surface of the steel bar mesh sheet, but also bound or welded with the reinforcement of the bottom plate foundation; The steel plate buckle is welded onthe reinforcing bar mesh sheet or pierced from the bottom of the reinforcing bar mesh sheet; The clasp binds the wire drawing rope to the pipe, the U-groove rib and the steel plate fastener. The claspbinds the wire drawing rope to the pipe, the U-groove rib and the steel plate fastener. The invention also discloses a construction method of the sandbar sewage pipe and the well anti-floating system. The invention changes the traditional method of deep burying, increasing dead weight and increasing fixed foundation, and provides a stable and safe anti-floating system and construction method forsandbar high-water-level pipe and well construction.
Owner:CHINA FIRST METALLURGICAL GROUP

Dam waterproof insulation structure and manufacturing method

The invention discloses a dam waterproof insulation structure and a manufacturing method. The dam waterproof insulation structure comprises a crush resistance structure plate and an insulation layer;the crush resistance structure plate is used for being fixed to the exterior facade or a slope of a dam, the crush resistance structure plate comprises an installing platform, the bottom end of the insulation layer is arranged at the installing platform, the inner side of the insulation layer is stuck to the exterior facade or the slope, and a first waterproof layer is arranged on the outer surface of the insulation layer. The crush resistance structure plate is arranged below the insulation layer, the crush resistance structure plate is fixed to the dam, upward pressure of water to the bottomof the insulation layer is transmitted to the dam, buoyancy of the insulation layer in water is eliminated, the phenomenon that the insulation layer is damaged or disengaged from the base layer of the dam body is avoided, and the insulation effect is ensured. The first waterproof layer is arranged on the outer surface of the insulation layer, the phenomenon that buoyancy is generated when the insulation layer is soaked with water is avoided, and the stability of the insulation layer is further ensured; the surface of the first waterproof layer is coated with an anti-ice pulling coating, so that the phenomenon that the insulation layer is damaged by an ice layer is avoided.
Owner:TIANJIN SENJUKE SEAL COATING MATERIALS CO LTD

Construction method of basement attached lane structure

The invention discloses a basement attached lane structure and a construction method thereof. The basement attached lane structure comprises a lane bottom plate, an anti-stick and waterproof coiling material, a waterproof mortar base layer and a lane bottom plate concrete cushion layer; a basement exterior wall and a lane outer side wall are respectively arranged on two sides of a lane bottom plate, the lane bottom plate, the basement exterior wall and the lane outer side wall are structurally integrated, and the waterproof mortar base layer and the anti-stick waterproof coiling material are respectively integral structures with two bent sides. The construction method includes sequentially constructing a waterproof protecting layer, the lane bottom plate concrete cushion layer, the waterproof mortar base layer, the anti-stick waterproof coiling material, the basement exterior wall, the lane bottom plate and the lane outer side wall layer by layer. As the basement exterior wall, the structure of a lane and various structures in the horizontal direction and the perpendicular direction of a lane are structurally integrated as much as possible and are constructed simultaneously, a construction period can be effectively shortened, the structure is also stable, and the problems of crack and water leakage can be prevented effectively.
Owner:广东中城建设集团有限公司 +1

Shazhou sewage pipe, well anti-floating system and construction method

The invention discloses a sandbar sewage pipe, well anti-floating system, include anti-float plates, Bundle wire, clip rib, steel mesh, U-groove ribs, steel plate fasteners, Staples, bracing ropes, Anti-float plate are arranged at that bottom of the pipeline and bind to the pipeline through bundle wires, A loc wire rib is inserted into that inn side of the bundle wire, and a binding surface with the pipe is added. The steel bar mesh sheet is arranged below the pipe and below the sewage well. The steel bar mesh sheet is welded with U-groove reinforcement or steel plate buckle, and the U-groovereinforcement is not only welded with the mesh surface of the steel bar mesh sheet, but also bound or welded with the reinforcement of the bottom plate foundation; The steel plate buckle is welded onthe reinforcing bar mesh sheet or pierced from the bottom of the reinforcing bar mesh sheet; The clasp binds the wire drawing rope to the pipe, the U-groove rib and the steel plate fastener. The claspbinds the wire drawing rope to the pipe, the U-groove rib and the steel plate fastener. The invention also discloses a construction method of the sandbar sewage pipe and the well anti-floating system. The invention changes the traditional method of deep burying, increasing dead weight and increasing fixed foundation, and provides a stable and safe anti-floating system and construction method forsandbar high-water-level pipe and well construction.
Owner:CHINA FIRST METALLURGICAL GROUP

A breathable metal filling box

The invention relates to a ventilation metal filling tank and a method for manufacturing the same, and belongs to the field of structures of common buildings. The ventilation metal filling tank (1) comprises upper assemblies (2), lower assemblies (3) and supports (4). The upper assemblies and the lower assemblies are made of metal sheets (5), each metal sheet is divided into a face plate (7) and two side plates (8) by two bend lines (6) on the metal sheet, dense meshes (9) are formed in regions of the face plates, slurry stopping sheets (10) are formed by metal sheets punched from the meshes, two ends of each metal sheet are respectively bent by 90-degree angles along the corresponding bend lines towards the same direction to form the corresponding upper assembly and the corresponding lower assembly, each of the upper assemblies and the lower assemblies is of a U-shaped structure with three surfaces, at least three supports are embedded in each upper assembly and the corresponding lower assembly, and the upper assemblies and the lower assemblies are oppositely fastened with one another to form the ventilation metal filling tank. The ventilation metal filling tank and the method have the advantages that the ventilation metal filling tank is quite convenient to produce, transport and mount and good in mechanical property, and a hollow floor system with the ventilation metal filling tank is good in reliability, earthquake resistance and cracking resistance.
Owner:郭伍常

A kind of anti-pull prestressed anchored gravel pile with bottom expansion-multi-stage side expansion and its construction method

The invention discloses a bottom expanding-multisection side expanding anti-pull prestressed anchoring gravel pile and a construction method and belongs to the technical field of foundation base structures. The gravel pile comprises a side expanding gravel pile body provided with multiple side expanding sections and at least one prestressed anchor cable / rod; an anchor disc is arranged at the top of the side expanding gravel pile body, and a bottom expanding base provided with an expanded bottom is arranged at the bottom of the side expanding gravel pile body. The construction method comprises the steps that a gravel pile hole is dug, and bottom expanding and side expanding are conducted; a hardcore bed is constructed; a reinforced concrete bottom expanding base is constructed, and the anchor cable / rod is fixed in the reinforced concrete bottom expanding base; the side expanding gravel pile body is constructed; the anchor disc at the top of the pile and an anchor plate are constructed, and anchor cable / rod prestressing force is exerted. According to the bottom expanding-multisection side expanding anti-pull prestressed anchoring gravel pile and the construction method, gravel is tightly pressed in a gravel hole through the anchor cable / rod so as to form the gravel pile body, so that the bottom expanding base, the gravel pile body and the anchor disc are made into a force-bearing whole, and thus the anti-pull capacity is effectively improved; in addition, the anti-shearing and anti-slip resistance between a pile body and a soil body is increased through the side expanding gravel pile body and the bottom expanding base, the stratum applicability of a structure is improved, and the influence of underground water is reduced.
Owner:湖南省地质勘探院有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products