Construction method for partition seams of concrete floor
A construction method and a technology of dividing warehouse joints, which are applied to floors, buildings, building structures, etc., can solve the problems of low frost heave resistance, poor use effect, and long construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0099] like figure 1 The shown construction method for the sub-silo joint of a concrete floor adopts the integrated sub-silo joint of galvanized sheet to carry out the sub-silo joint construction of the concrete floor to be constructed;
[0100] like Figure 13 , figure 2 , image 3 , Figure 4 As shown in the figure, the galvanized sheet-integrated sub-silo seam includes an on-site assembled sub-silo seam assembled from a plurality of straight sub-silo seams and a plurality of cross-shaped sub-silo seams, and a plurality of the straight sub-silo seams and a plurality of the cross-shaped warehouse sub-slots are arranged on the same horizontal plane; the structures of the plurality of the cross-shaped warehouse sub-slots are the same, and each of the cross-shaped warehouse sub-slots is arranged horizontally; a plurality of the flat The structures of the straight silo seams are the same, and they are arranged in multiple rows and columns, and each of the straight silo seams...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com