Tunnel intersected grouting and water plugging drilling structure and construction method thereof

A construction method and technology of grouting holes, applied in tunnels, tunnel linings, drainage, etc., can solve problems such as difficult construction, difficult grouting with water, and complicated processes

Pending Publication Date: 2019-08-30
NO 5 ENG OF CHINA RAILWAY 19 BUREAU GRP
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For the treatment of leakage water in the tunnel arch, the traditional treatment method is grouting at the leakage water point, but the effect of on-site implementation is not good. The reason is that the grouting hole layout is unreasonable and the water-filled grouting is difficult. aspects
The traditional treatment method uses radial drilling an...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel intersected grouting and water plugging drilling structure and construction method thereof
  • Tunnel intersected grouting and water plugging drilling structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] see Figures 1 to 2 , figure 1 is a schematic cross-sectional view of a tunnel applying an embodiment of the present invention, figure 2 It is a schematic diagram of the grouting water blocking drilling structure of the embodiment of the present invention. The grouting water blocking drilling structure includes two drainage holes 1 and two grouting holes 2, the two drainage holes 1 are intersected on both sides of the crack in the tunnel arch, and the two grouting holes 2 are intersected in the tunnel arch on both sides of the crack. The intersection of two drainage holes 1 is arranged on the top of the intersection of two grouting holes 2, and drainage hole 1 is not communicated with the grouting hole 2. The first end of the drainage hole 1 is set in the surrounding rock of the arch of the tunnel, and the second end of the drainage hole 1 penetrates the initial support 3 and communicates with the inner space of the tunnel. The first end of grouting hole 2 is arran...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Lengthaaaaaaaaaa
Elevation angleaaaaaaaaaa
Lengthaaaaaaaaaa
Login to view more

Abstract

The invention provides a tunnel intersected grouting and water plugging drilling structure and a construction method thereof. The drilling structure comprises two drainage holes and two grouting holes; the two drainage holes are arranged on two sides of a crack at the arch part of a tunnel is an intersected mode; and the two grouting holes are arranged on two sides of the crack at the arch part ofthe tunnel in an intersected mode, and are positioned above the two grouting holes. The construction method comprises the following steps: after the position of the crack for water leakage at the arch part of the tunnel is determined, the two drainage holes and the two grouting holes are arranged on the two sides of the crack in an intersected mode; first orifice pipes and first gate valves are mounted in the drainage holes; second orifice pipes and second gate valves are mounted in the grouting holes; at least one first gate valve is opened for water leakage; two second gate valves are opened for grouting the two grouting holes; one of the first gate valves is closed, and the drainage hole with the other first gate valve is grouted; and the closed first gate valve is opened, and the drainage hole thereof is grouted. The drilling structure is excellent in grouting and water plugging effect, and guarantees no water leakage phenomenon in later building.

Description

technical field [0001] The invention relates to the technical field of tunnel crack repair, in particular to a tunnel cross-type grouting water blocking drilling structure and a construction method thereof. Background technique [0002] During tunnel construction, due to passing through the surrounding rocks, soluble rocks, water-rich ends, broken cracks, etc., there will often be water leakage after the initial support construction of the tunnel is completed, and the parts where water leakage occurs are usually It consists of four parts: tunnel arch, spandrel, side wall and tunnel bottom. Among these four parts, the seepage water in the arch and the bottom of the tunnel is the most difficult to deal with. For the treatment of leakage water in the tunnel arch, the traditional treatment method is grouting at the leakage water point, but the effect of on-site implementation is not good. The reason is that the grouting hole layout is unreasonable and the water-filled grouting ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D11/10E21F16/02
CPCE21D11/10E21F16/02
Inventor 刘国强
Owner NO 5 ENG OF CHINA RAILWAY 19 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products