Pouring Positioning of Larger Span Beams and Replacement Method of Early Dismantled Formwork
A technology for early dismantling of formwork and span beams, applied to formwork/formwork/work frame, on-site preparation of building components, construction, etc., can solve the problems of complex installation, long cycle, and large amount of materials used
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0028] Example: such as Figure 1-5 As shown in the figure, a large-span beam pouring positioning and early demolition formwork replacement method includes the following steps:
[0029] Step 1: Arrange 288 short support pipes 3 at fixed points according to the beam pouring structure in a square array, then place long support pipes 9 on each short support pipe 13, and pass the short support pipes 13 and long support pipes 9 through the pipe fittings The hoop 12 is snap-fitted and fixed to the grooves on the short support tube 13 and the long support tube 9 . Realize that the short support pipe 13 and the long support pipe 9 are in a hoop-type integrated connection structure, which is convenient for future disassembly while maintaining the support strength.
[0030] Step 2: Then the limit frame support frame 6 is lifted to the position of the clamping socket with the support top plate 7 through the cylinder limit hoop 8 which is socketed with the long support pipe 9, at this ti...