Power system project management system
A project management system and power system technology, applied in data processing applications, instruments, resources, etc., can solve problems such as increasing project costs and affecting project efficiency, improving the difficulty of decision-making and planning, ensuring the promotion cycle, and ensuring the accuracy and confidentiality of information sexual effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] refer to figure 1 , a power system project management system, including: a total control unit 100, the total control unit 100 includes a database server 110, and a site management machine 120, the database server is used to record all information of the project in the power system, and the site management machine serves as The control device for background management is used to send instructions to the corresponding sub-control units;
[0045] And several sub-control units 200, the sub-control units include a plurality of user-side control units 210 and device-side control units 220, the user-side control units give control authority according to the user level, and are used to input the current item type and view the current The actual progress information of the project; when the user end unit can handle time, cost, quality, risk, contract, procurement, human resources user;
[0046] The device-end control unit is used to collect a number of information sensors insta...
Embodiment 2
[0073] The above-mentioned embodiment 1 provides specific implementation nodes of the overall project management system, and provides a complete data processing method, and further utilizes the above-mentioned data to realize refined project management.
[0074] During the implementation of the project, the construction information from the project site is received, and compared with the overall process information of the project, it is concluded whether the situation of the construction site at this time is normal or in the state of early warning, alarm, and accident, and displayed in The on-site management machine.
[0075] The user-side control unit performs corresponding measures according to the situation of the construction site fed back by the site management machine. The user-side control unit includes first-level users, second-level users and third-level users. The third-level users on the site handle it; when the situation at the construction site is an alarm state, ...
Embodiment 3
[0090] As shown in Embodiment 1 and Embodiment 2, authorization and access control mechanisms are established in this solution, which can better manage projects from the perspective of personnel.
[0091] The user terminal control unit provides the user with authorization management services, authorization and access control mechanisms; the user inputs a number of item information related to the above items, and each piece of item information corresponds to one of the items.
[0092] Establish the corresponding relationship between the project members and the corresponding rights and responsibilities information, and establish a communication channel for synchronizing project information for project members who meet the preset communication conditions; after establishing the authorization and access control mechanism, the system obtains the file operation initiated by the user, And judging whether the user has the authority to operate the file according to the login information...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com