Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method of portal section, passing through loose media, of tunnel

A construction method and loose body technology, applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve problems such as cracking and lack of slippage, achieve the effect of solving easy slippage and improving the stress state of cantilever structures

Active Publication Date: 2019-10-25
ERCHU CO LTD OF CHINA RAILWAY TUNNEL GRP
View PDF6 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Before the tunnel is excavated into the hole, after the vertical slope of the hole is excavated in place, the guide wall of the pipe shed is constructed, the guide pipe is pre-buried, and the drill pipe is processed at the same time, and a high-power air compressor is equipped. The locator is positioned, and the deviation is corrected in time according to the drilling deviation of the rod body during the drilling process. At the same time, the power is adjusted according to the drilling length and the address of the soil layer to ensure the depth and position of the drilling rig. After the drilling is completed, separate the drilling rig with the drill pipe and grouting; start the construction of the next pipe shed to form a stable arch ring outside the excavation. The technical solution is accurate in the drilling process and high in hole forming efficiency. deficient in shifting

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of portal section, passing through loose media, of tunnel
  • Construction method of portal section, passing through loose media, of tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] Described construction method comprises the steps:

[0030] Step 1, ground surface reinforcement at the entrance section: level the ground in the grouting area, place a drilling rig on the ground after leveling and drill the hole to the designed depth, and place the grouting pipe 2 in the drilled hole; In the vertical reinforcement method, the grouting grout is evenly injected into the soil from the grouting pipe 2 through the grouting pump and the grouting pipe, and the moisture and gas between the loose rock mass particles are driven away by filling and infiltration; the grouting grout Prioritize the use of cement slurry; check the strength and bearing capacity of the grouting body after construction;

[0031] Step 2. Slope protection at the entrance of the cave: use an excavator to excavate the slope surface 3, manually repair the slope surface 3, and use a concrete sprayer to spray the concrete; after the sprayed concrete reaches the design strength, the anchor cabl...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a portal section, passing through loose media, of a tunnel. The method comprises the steps of 1, reinforcing the surface of a portal section; 2, protecting the side slope at the portal, excavating the slope surface by adoption of an excavator, manually repairing the slope surface, carrying out a concrete injection operation by adoption of a concreteinjector, placing an anchor drilling machine for hole drilling after the injected concrete achieves the designed strength, manually mounting an anchor after the hole is formed, and carrying out anchor grouting adoption of a backward grouting method; 3, constructing a slide-resistant pile and a crown beam at the portal; 4, constructing a protection arch and a pipe shed at the portal; 5, reinforcing the foundation at the portal; and 6, constructing a tunnel underground excavation section. According to the method, a holing supporting form which adopts a pile and arch structure in combination with the pipe shed is put forward; and the cantilever structure stress state of pipe shed holing is converted into a favorable stress structure of two fixed ends, so that the core problems that the supporting structure below the loose media at the portal is easy to slide and the settlement deformation is large are solved, and the aim of safe, feasible and reliable holing is achieved.

Description

technical field [0001] The invention relates to the technical field of a construction method for an entrance section of a tunnel engineering, in particular to a construction method for an entrance section of a tunnel passing through a loose body. Background technique [0002] China has a vast territory and complex terrain and geological conditions. During the construction of tunnels, there are also unfavorable geological conditions such as tunnel openings located in broken zones, loose bodies, weak strata, water gushing, and sand gushing layers. For tunnel entry in such geological sections, long pipe sheds are often used as the main measure in China at present; Excavation disturbances, cracking and slippage may still occur after the side elevation of the tunnel entrance section is unstable, resulting in the risk of excessive settlement in the tunnel and intrusion into the tunnel clearance; subsequent treatment and rectification will be required, such as changing the arch or ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21D11/10E21D11/15E21D11/18E21D11/38
CPCE21D11/10E21D11/105E21D11/107E21D11/152E21D11/18E21D11/38
Inventor 段杰文赵宝锋张宁曹露平许金王建军吴建林马海林李社伟郭伟陈潇董晓亮李健康饶斌丛晓飞李智勇陈德胜吕鹏王凡赵凡睿
Owner ERCHU CO LTD OF CHINA RAILWAY TUNNEL GRP