Construction method of arch ribs of deck type box arch bridge

A construction method and arch rib technology, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of heavy weight, difficult lateral movement of steel trusses, and slow lateral movement speed.

Active Publication Date: 2019-11-12
CHINA RAILWAY 20 BUREAU GRP
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] But nowadays, when the steel arch is moved horizontally, the construction operation is relatively random, there is no uniform and standardized horizontal installation equipment and horizontal moving method, and the steel truss is large in size and heavy, and the steel truss is difficult to move laterally , during the traversing process, there will inevitably be problems such as complex traversing process, unstable steel truss, and slow traversing speed, and the steel truss is not easy to support after the traversing is in place.
At the same time, when removing the steel arch from under the poured arch

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of arch ribs of deck type box arch bridge
  • Construction method of arch ribs of deck type box arch bridge
  • Construction method of arch ribs of deck type box arch bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0199] Such as figure 1 Shown is a construction method for the arch ribs of an upwardly supported box arch bridge. The constructed upwardly supported arch bridge includes two symmetrically arranged arch ribs 2 on the left and right. Described arch rib 2 is the post-construction arch rib that will be constructed after the construction of the first construction arch rib is completed; the front and rear ends of each described arch rib 2 are respectively supported on a permanent support 6, and the permanent support 6 It is a reinforced concrete support, and the arch rib 2 is arranged along the longitudinal direction of the bridge and it is a reinforced concrete arch ring. For details, see Figure 4 ;

[0200] Such as Figure 4 As shown, a main girder is arranged directly above each of the arch ribs 2; the front and rear ends of each main girder are respectively supported on an abutment 8, and the main girder is arranged horizontally and includes supports on The middle beam sect...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method of arch ribs of a deck type box arch bridge. The constructed deck type arch bridge comprises the two arch ribs which are symmetrically arranged on the left and right sides. During the construction of the arch ribs of the deck type arch bridge, the construction method comprises the following steps: (1) performing the construction of a lower supporting structure of the bridge; (2) performing the construction of the arch ribs. The process of the construction of the arch ribs comprises the steps of performing the construction of steel arch supports, mounting translation slideways and lifting devices, assembling a steel arch, lifting up an arched support frame, performing the construction of the earlier-construction arch rib, laying the arched support frame downward, mounting transverse-movement driving devices, transversely moving the arched support frame, lifting up the arched support frame, performing the construction of the later-construction arch rib, and removing the arched support frame. The construction method of the arch ribs of the deck type box arch bridge is reasonable in design, simple in construction and good in application effect. The two arch ribs are constructed one after the other by virtue of the steel arch, and the steel arch is supported and transversely moved by virtue of an arch supporting and transverse-movement device, so that the construction process of the two arch ribs can be completed simply and quickly. The construction process is safe and reliable. The construction efficiency of the deck type arch bridge can be effectively improved.

Description

technical field [0001] The invention belongs to the technical field of bridge construction, and in particular relates to a method for constructing an arch rib of an upwardly supported box-shaped arch bridge. Background technique [0002] The overhanging arch bridge is a bridge whose deck is set on the main load-bearing structure of the bridge span (that is, the arch rib). At the junction of the bedrock, both ends of the arch ribs of the upward arch bridge are supported on the abutment, which is an important component supporting the structure on the arch. The abutment used to support the arch rib is a permanent support, which is generally a reinforced concrete structure supported on the bedrock. Among them, the arch rib is also called the main arch or the arch ring. For the construction of the box-type box arch bridge whose arch rib is reinforced concrete arch ring, the arch rib usually adopts the pre-erected steel arch frame for cast-in-place construction; After the ribs a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 仲维玲梁之海朱红桃余雄军
Owner CHINA RAILWAY 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products