Spraying method for construction of concrete for slope reinforcement of water-level-fluctuating zone

A spraying method and concrete technology, applied in excavation, infrastructure engineering, construction, etc., can solve the problems of high concrete rebound rate, low construction quality and construction efficiency, etc., to improve construction quality, improve construction efficiency and quality, and improve The effect of jet quality

Inactive Publication Date: 2019-11-15
瑞派尔(宜昌)科技集团股份有限公司
View PDF2 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Aiming at the deficiencies of the prior art, the present invention provides a spraying method for concrete construction for slope reinforcement in a water-fluctuating zone, which has the advantages of high construction quality and high construction efficiency, and solves the problems caused by the high rebound rate of concrete during the spraying process, which causes poor construction quality. and low construction efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0025] A spraying method for concrete construction for slope reinforcement in a water-fluctuation zone, comprising the following steps:

[0026] 1) Clean up the rock surface, remove loose rocks, pumice, dust, slag and other sundries on the surface to be sprayed. For soil slopes, level and compact the slope, set spray layer signs as required, spray Layer thickness control marks adopt steel bars or metal nails, the distance between steel bars or metal nails is 3m, and the length of the protruding part of steel bars or metal nails is the thickness of shotcrete;

[0027] 2) Lay the reinforcement mesh along the designated position in step 1) before spraying concrete. After the reinforcement mesh is transported to the working face, it is manually fixed on the bent frame with anchor head spot welding, the middle is encrypted and fixed with expansion bolts, and the joints between the meshes are fastened with lead wires , control the thickness of steel mesh protective layer to 30mm;

...

Embodiment 2

[0035] A spraying method for concrete construction for slope reinforcement in a water-fluctuation zone, comprising the following steps:

[0036] 1) Clean up the rock surface, remove loose rocks, pumice, dust, slag and other sundries on the surface to be sprayed. For soil slopes, level and compact the slope, set spray layer signs as required, spray Layer thickness control marks adopt steel bars or metal nails, the distance between steel bars or metal nails is 5m, and the length of the protruding part of steel bars or metal nails is the thickness of shotcrete;

[0037] 2) Lay the reinforcement mesh along the designated position in step 1) before spraying concrete. After the reinforcement mesh is transported to the working face, it is manually fixed on the bent frame with anchor head spot welding, the middle is encrypted and fixed with expansion bolts, and the joints between the meshes are fastened with lead wires , control the thickness of steel mesh protective layer to 50mm;

...

Embodiment 3

[0045] A spraying method for concrete construction for slope reinforcement in a water-fluctuation zone, comprising the following steps:

[0046] 1) Clean up the rock surface, remove loose rocks, pumice, dust, slag and other sundries on the surface to be sprayed. For soil slopes, level and compact the slope, set spray layer signs as required, spray Layer thickness control marks adopt steel bars or metal nails, the distance between steel bars or metal nails is 4m, and the length of the protruding part of steel bars or metal nails is the thickness of shotcrete;

[0047] 2) Lay the reinforcement mesh along the designated position in step 1) before spraying concrete. After the reinforcement mesh is transported to the working face, it is manually fixed on the bent frame with anchor head spot welding, the middle is encrypted and fixed with expansion bolts, and the joints between the meshes are fastened with lead wires , control the thickness of steel mesh protective layer to 40mm;

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
particle diameteraaaaaaaaaa
tensile strengthaaaaaaaaaa
diameteraaaaaaaaaa
Login to view more

Abstract

The invention relates to the technical field of reservoir slope construction, and discloses a spraying method for construction of concrete for slope reinforcement of a water-level-fluctuating zone. The spraying method includes the following steps that (1) the rock face is cleaned, loose rocks, pumice stone, dust, slag and other debris on the sprayed face are removed, for a soil slope, the slope isleveled and compacted, a spraying layer mark is arranged as required, the spraying layer thickness control mark adopts rebars or metal nails, the space between the rebars or the metal nails is 3-5 m,and the length of the extension part of the rebars or the metal nails is the thickness of sprayed concrete. According to the spraying method for construction of the concrete for slope reinforcement of the water-level-fluctuating zone, the space between the arranged rebars or the metal nails is 3-5 m, the length of the extension part of the rebars or the metal nails is the thickness of the sprayedconcrete, so that the rebars or the metal nails can be covered by the sprayed concrete after spraying of the concrete is completed, the spraying quality of the concrete is increased, after installation and debugging are also completed through a spraying machine, firstly water is injected, then ventilation is conducted, and pipelines are cleaned.

Description

technical field [0001] The invention relates to the technical field of reservoir slope construction, in particular to a spraying method for concrete construction for slope reinforcement in a water-fluctuation zone. Background technique [0002] The reservoir ebb and flow zone, also known as the fluctuation zone or the ebb and flow area, is the area where the seasonal water level of the reservoir fluctuates and the surrounding submerged land is periodically exposed to the water surface. In addition, it also includes the ebb and flow zone caused by special climate. The formation of the belt is mainly caused by the rise and fall of water level caused by periodic flood storage or flood discharge. The sinking zone is divided into cliff bank, steep slope bank, beach slope bank and platform bank according to the slope. Before the sinking zone is formed, it grows in the reservoir area. The vegetation on both sides of the strait is a natural ecological barrier, which can intercept an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/20E02D15/02
CPCE02D15/02E02D17/20
Inventor 陈小华康德忠胡兴玉邓金桥金磊
Owner 瑞派尔(宜昌)科技集团股份有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products