Painting mortar empty drum bonding regeneration technology
A kind of hollow and technical technology, applied in building maintenance, covering/lining, construction, etc., can solve the problems of mortar hollow or partial hollow, unable to solve safety hazards, cutting section cracking, etc., to save resources and reduce construction waste , the effect of stable quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0026] Example: Combine figure 1 As shown, a kind of stucco mortar hollow drum bonding regeneration technology provided by the present invention specifically includes the following steps:
[0027] 1. Determination of hollowing range and hollowing layer;
[0028] 2. The length of the anchor is determined; the number of holes is determined, and the holes are drilled without dust and vibration at the same time;
[0029] 3. Hole cleaning treatment;
[0030] 4. Install the grouting anchor, and the anchor foot expands;
[0031] 5. Configure grouting material;
[0032] 6. Grouting, grouting inspection, grouting hole repair;
[0033] 7. Conservation to form a beautification layer, check and accept.
[0034] Wherein, the range of the hollow drum is determined by drilling samples or photographing the hollow drum, and the hollow drum layer is confirmed by listening to sounds or infrared imaging.
[0035] The length of the anchor is determined according to the thickness of the hollo...
Embodiment 1
[0037] Embodiment 1: Drill 16 holes within one square meter, all of which are anchor holes, inject resin into the hollow layer through the anchor nails, form the hollow hollow layer 7 for grouting, and form the hollow hollow layer for grouting where there is no grouting At the same time, after grouting, the surrounding circle is a grouting diffusion area 10, which is modified by a beautification layer 11 after grouting.
Embodiment 2
[0038] Embodiment 2: In this embodiment, 41 holes are drilled in a plum blossom arrangement, 25 holes in the 41 holes are used to install anchors, and the remaining 16 holes are not equipped with anchor holes, but simple grouting holes, and The distance between each two holes is not greater than 330mm. During the drilling process, the 25 holes with anchors are processed first. After the overall inspection, the 16 holes without anchors are completed in turn. Check to determine whether supplementary drilling is required. At the same time, the drilling is performed through a special drill bit and a drill pipe, wherein a collection device is provided at the end of the drill pipe to collect the sewage and dirt generated by the drilling. At the same time , the drill bit is made of corundum.
[0039] When configuring the grout, use a special polymer grout, use cement-based polymer or resin as the raw material, the viscosity is 100-100000, the bond strength is greater than 0.7MPA, the...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Bond strength | aaaaa | aaaaa |