Outside-pit rescue emergency well construction method

A construction method and wellbore technology, which can be used in infrastructure engineering, construction, etc., can solve the problems of ineffective control of the sand content of pumped water, difficulty in normal well formation, and technical difficulties, so as to reduce the risk of environmental deformation and reduce backfilling. quantity, and the effect of improving the quality of effluent

Inactive Publication Date: 2019-12-27
SHANGHAI GUANGLIAN ENVIRONMENTAL & GEOTECHNICAL ENG CO LTD
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The problem of groundwater, especially confined water, has become a frequent challenge for subway construction foundation pit projects. Groundwater problems are complex, technically difficult, and construction risks are high. Once a major safety and quality accident occurs, it is easy to cause serious property losses or casualties , if the emergency response is not timely, it may even endanger public safety
[0003] In recent years, there have been more and more foundation pit accidents caused by improper groundwater control. Some foundation pits urgently need to set up emergency dewatering wells outside the pit after accidents. However, due to many obstacles in the accident area, large soil disturbance, and large hydraulic gradient , it is difficult to complete the well, which greatly delays the emergency rescue time; at the same time, when the emergency well is drilled outside the pit, considering the possible construction outside the pit, the emergency well may become an obstacle in the later construction; if the pumping sand content of the emergency well outside the pit is If it is not effectively controlled, it is easy to have obvious deformation risks around the well

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Outside-pit rescue emergency well construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The embodiments of the present invention are described in further detail below in conjunction with the accompanying drawings, but the present embodiments are not intended to limit the present invention. All similar structures and similar changes of the present invention should be included in the scope of protection of the present invention. The commas in all represent the relationship between and, and the English letters in the present invention are case-sensitive.

[0024] Such as figure 1 As shown, the construction method of an emergency well outside a pit provided by the embodiment of the present invention is characterized in that the specific steps are as follows:

[0025] 1) Select an impermeable solid pipe as the wall casing 4, drill the emergency well hole in the soil at the target well location, and lower the wall casing 4 into the well hole, and use the wall casing 4 to pair the well holes The wall forms a support and prevents the rapid leakage of the slurry d...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an outside-pit rescue emergency well construction method, and relates to the technical field of infrastructure construction. The technical aim of foundation pit emergency rescue can be achieved. The method comprises the steps that a protection casing is tripped in a well hole, and the protection casing is used for forming supporting on the wall of the well hole; an emergency well tube is tripped into the protection casing, the middle tube segment of the emergency well tube is a dual-layer filter tube internally containing filter materials, and the upper tube segment andthe lower tube segment are waterproof solid tubes; the filter materials are backfilled into the annular space between the emergency well tube and the protection casing, and the top face of the backfilled filter materials is higher than the middle tube segment of the emergency well tube; the protection casing is lifted to the position which is higher than the middle tube segment of the emergency well tube and lower than the top face of the backfilled filter materials; a fixing clamp is used for fixing a well opening of the emergency well tube and the protection casing; and rescue water drawingcan be implemented; after emergency rescue is finished, the emergency well tube, and the protection casing are sequentially drawn out upwards; and the backfilled clay is used for filling and levelingup the well hole. The method can achieve rapid well sinking and rapid recycling.

Description

technical field [0001] The invention relates to infrastructure construction technology, in particular to a construction method for an emergency well outside a pit. Background technique [0002] The problem of groundwater, especially confined water, has become a frequent challenge for subway construction foundation pit projects. Groundwater problems are complex, technically difficult, and construction risks are high. Once a major safety and quality accident occurs, it is easy to cause serious property losses or casualties , if the emergency response is not timely, it may even endanger the public safety of the society. [0003] In recent years, there have been more and more foundation pit accidents caused by improper groundwater control. Some foundation pits urgently need to set up emergency dewatering wells outside the pit after accidents. However, due to many obstacles in the accident area, large soil disturbance, and large hydraulic gradient , it is difficult to complete t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D19/10
CPCE02D19/10
Inventor 陆建生吴振华李璞刘中浩沈驰钱志兴周亚宝
Owner SHANGHAI GUANGLIAN ENVIRONMENTAL & GEOTECHNICAL ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products