Blast furnace top ignition method
A blast furnace and furnace top technology, applied to blast furnaces, blast furnace details, blast furnace parts, etc., can solve the problems of gas combustion volume reduction, ignition gun difficult to ignite the gas in the furnace, explosion, etc., to reduce time-consuming and avoid furnace Vertex fire, the effect of improving safety performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0028] A blast furnace top ignition method, its operating steps are:
[0029] a) The blast furnace is in the later stage of the last slag and iron discharge before the wind shutdown. The calculation theory is that the slag and iron are clean, and the blast furnace taphole has a tendency to come in the wind. , steam with a pressure of 0.6MPa is fed into the top of the furnace, nitrogen with a pressure of 0.8MPa is fed into the gravity dust collector, the feeding system in the furnace is manually loaded, and the feeding time is determined according to the temperature of the furnace top. ℃ range, the depth of the material line is within 2.5 meters, the air reduction range is based on the iron mouth not blowing. When the wind comes in, open the furnace top, let the gravity dust collector disperse, and shut down the blast furnace;
[0030] b) After the blast furnace is shut down, the bag glasses valve will be closed, the blast furnace will be shut down for 15 minutes, the backflow...
Embodiment 2
[0034] When the blast furnace is shut down under abnormal conditions, the depth of the material line cannot be controlled, and the temperature of the furnace top is usually higher than 200°C. At this time, the ignition operation on the furnace top is prohibited. After the shutdown, the operation steps for the depth of the material line are greater than 4 meters:
[0035] e) After the wind is turned off, the depth of the material line is greater than 4 meters, the maximum amount of steam or nitrogen is introduced into the top of the furnace, and the water leakage cooling wall in the main body area of the blast furnace is closed.
[0036] f) Organize personnel to remove the tuyere blowpipe, seal all the tuyere with water gun mud and add a sealing plate to the tuyere;
[0037] g) Block the tuyere for 60 minutes, the reaction in the furnace is relieved, the top gas is gradually stabilized, put ore or slag into the furnace, and the amount is controlled by the depth of the material...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com