A technology of large footage and hydraulic fracturing of blasting roadway, applied in blasting, tunneling, earthwork drilling and other directions, can solve problems such as difficulty in controlling the contour shape of the excavation surface, affecting the excavation speed, and increasing the construction cost, so as to avoid uncertainty. , the effect of improving efficiency and increasing the number of disturbances
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2020-01-24
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of roadway excavation, and in particular relates to a hydraulic fracturing combined hydraulic blasting roadway large-scale excavation method and a fracturing device. Background technique
[0002] In the process of coal mining, sometimes it is inevitable to encounter hard coal rocks. At this time, conventional mechanical coal mining cannot meet the requirements. Loosening and cracking methods must be used to reduce the strength of the top coal before mechanical mining. After searching the existing technical documents, it was found that the Chinese patent application number 201610500132.X, the name of the invention: a method for rapid excavation of tunnels by hydraulic fracturing segmental blasting, the publication number CN106150507A, the patent reads as: the patent of the present invention relates to a The method for tunneling fast in the hard rock under the mine comprises the following steps: (1) drill 5 bo...
Examples
Embodiment 1
[0065] use as Figure 5 The blasting hole layout shown in the blasting excavation construction includes the peripheral outline blasting hole 1 arrangement layer a, and the broken blasting hole 3 arrangement layers b, c, d, e; during the blasting construction, the coal The drilling sequence of the holes is a-b-c-d-e, that is, the drilling and blasting of the layout layer a of the contour blasthole 1 is carried out first; then check whether the coal and rock fragmentation meets the mechanical mining conditions, and if not, proceed to the arrangement of the broken blasthole 3 Drilling and blasting of layer b; then check the fragmentation degree of coal and rock, and when the conditions for mechanical mining are not met, then drill and blast the layer c where the broken blasting holes are arranged, and so on according to this principle, until the crushing blasting is carried out Drilling and blasting of hole 3 arrangement layer e. There is no corresponding relationship between th...