A Construction Technology of Prefabricated Water-brushed Stone Concrete Railing

A construction technology and concrete technology, applied in the direction of manufacturing tools, strengthening molding, ceramic molding machines, etc., can solve the problems of unreasonable thickness of reinforcement and protective layer, maintenance of concrete components, improper pouring management, etc., to achieve construction operability and Strong adjustability, good bonding and durability, and the effect of saving construction time

Active Publication Date: 2021-07-13
SOUTHEAST UNIV
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, most of the traditional concrete railing construction technology is on-site pouring construction, which is prone to the following problems: improper concrete vibration sequence and method; no maintenance of concrete components; excessive drop or pouring layer thickness during concrete pouring; concrete strength lower than formwork removal strength However, premature removal of formwork; unauthorized handling of concrete quality defects by the construction unit; random addition of water at the construction site; improper pouring management, unreasonable thickness of reinforcement and protective layer; excessive slump required at the construction site; , delayed vibration; a series of non-standard constructions such as the waiting time of concrete at the construction site is too long

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Construction Technology of Prefabricated Water-brushed Stone Concrete Railing
  • A Construction Technology of Prefabricated Water-brushed Stone Concrete Railing
  • A Construction Technology of Prefabricated Water-brushed Stone Concrete Railing

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0039] As shown in the figure, when a bridge approach railing is being constructed, the technology disclosed by the present invention is used to construct the approach railing.

[0040] (1) Take the finished railings produced by the factory and transport them to the site for installation. First, the columns are opened with a silicone mold, and the embedded steel plates 1 and steel cages 2 are placed before pressure grouting. The columns are integrally poured with fine aggregate concrete. The handrails are integrally poured with fine aggregate concrete, and the railings and decorative panels are integrally poured with fine aggregate concrete. When half-dry, the formwork is demolished and the washed surface has the effect of water-brushed stone surface; the materials used for the railings are designed to match The ratio and related indicators are: water-cement ratio 0.41, sand rate 42%; the ratio of materials per cubic meter of concrete is 0.32 for water, 1 for cement, 0.25 for c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction process of prefabricated stone imitation concrete railings. The specific steps are as follows: the columns, handrails and railings are all molded with silica gel molds, and the reinforcement cages and steel plates are configured to perform pressurized grouting. Integral pouring, the steel plate at the bottom of the column is welded to the steel plate reserved for the sidewalk, the handrail is mechanically connected to the column, and then the hole of the column is sealed with grouting material; As a whole, after the assembly is completed, the gaps and cavities in the joint position are filled with structural glue. Beneficial effects of the present invention: while saving construction time, it solves the engineering limitation of not having on-site pouring, and it is formed by one-time pouring with water-brushed stone material, which can make the surface layer and the structural layer have better adhesion and better durability And combination, more green and environmental protection, quick construction, and make the surface layer have the effect of water-brushed stone surface layer.

Description

technical field [0001] The invention relates to a construction process of prefabricated concrete railings imitating water-brushed stone, and belongs to the technical field of bridge railing construction. Background technique [0002] At present, most of the projects in our country need to use concrete structures. For concrete structures, the deterioration of concrete, whether the surface defects of concrete can be controlled, and whether the durability of concrete can meet the service life are all closely related to the construction technology, construction details and maintenance of concrete at the construction site. [0003] At present, most of the traditional concrete railing construction technology is on-site pouring construction, which is prone to the following problems: improper concrete vibration sequence and method; no maintenance of concrete components; excessive drop or pouring layer thickness during concrete pouring; concrete strength lower than formwork removal s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): B28B21/56B28B23/02
CPCB28B21/56B28B23/024
Inventor 淳庆张承文金辉林怡婕
Owner SOUTHEAST UNIV