Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction Method of Composite Strong Bridge Deck Pavement

A bridge deck pavement and construction method technology, which is applied to bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as difficult quality control, short service life, hidden safety hazards, etc., to reduce the construction period, improve construction quality, Guarantee the effect of installation quality

Active Publication Date: 2021-04-06
SICHUAN JIAOTOU CONSTR ENG CO LTD
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the reinforced mesh of this kind of traditional bridge deck pavement is easy to "sink to the bottom", and the quality is difficult to control. Due to various unfavorable factors such as construction and environment, it will cause cracks, local potholes and other diseases in a short period of time, and even worse. However, due to the backwardness of concrete mix ratio design, concrete mixing, pouring and maintenance technology, a large number of cracks appeared in the early stage after concrete pouring. These diseases seriously affected driving comfort, structural safety and traffic capacity, and caused safety hazards
[0004] Therefore, it is very important to seek a construction method of composite strong bridge deck pavement that can solve the problems of more defects and shorter service life of this traditional bridge deck pavement.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction Method of Composite Strong Bridge Deck Pavement
  • Construction Method of Composite Strong Bridge Deck Pavement
  • Construction Method of Composite Strong Bridge Deck Pavement

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] The present invention will be further described below in conjunction with the examples. The description of the following examples is provided only to aid the understanding of the present invention. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.

[0052] combined with figure 1 to attach Figure 17 As shown, the composite strong bridge deck pavement is composed of a strong connection layer 4, a high crack-resistant concrete leveling layer 5, a waterproof bonded stress absorption layer 6 and an asphalt surface layer 7; both sides of the composite strong bridge deck pavement are provided with Crash barrier14. Its construction method includes the following steps:

[0053] Step 1: Measure and set out, carry ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction method for composite strong bridge deck pavement, which includes steps: step 1: measure and set out the line, and carry out pre-embedded bolt sleeve construction in the beam body; step 2: adjust the gap between two sliding formworks by moving the fixing nut on the adjusting screw rod left and right step 3: pour concrete into the hopper; step 4: install the channel steel track; step 5: do roughening and cleaning on the top of the beams on the bridge deck; step 6: pour concrete between adjacent beams to form wet joints ; Step 7: install the vibrating beam on the channel steel track; Step 8: remove the channel steel; The SBS modified asphalt mixture is paved and rolled to form the asphalt surface layer. The beneficial effects of the present invention are: the bottom plate of the pre-embedded bolt sleeve of the present invention is connected with the fixed steel bar of the beam body, and the top is connected with the upper layer of the beam body steel bar, so that the precise positioning of the pre-embedded bolt sleeve can be realized.

Description

technical field [0001] The invention relates to the technical field of bridge deck pavement construction, in particular to a construction method for composite strong bridge deck pavement. Background technique [0002] In recent years, with the rapid development of expressway construction in my country, the expressway has rapidly extended to mountainous areas with complex terrain and geological conditions, and bridges account for an increasing proportion of the total length of the route. With the continuous increase in traffic volume and severe weather, the bridge deck pavement that directly bears the wheel load is facing severe challenges. [0003] Existing high-grade highway bridge deck pavement generally adopts cement concrete with steel mesh sheets as the lower layer of bridge deck pavement, and asphalt concrete is used as the upper layer of bridge deck pavement. However, the reinforced mesh of this kind of traditional bridge deck pavement is easy to "sink to the bottom"...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 彭庆华龚霞袁国彬
Owner SICHUAN JIAOTOU CONSTR ENG CO LTD