Construction method capable of causing pilot hole to pass through large-area drifting sand layer through shaft counter-drilling method

A construction method and pilot hole technology, applied in drilling equipment and methods, shaft equipment, wellbore/well components, etc., can solve problems such as high safety risks, hole wall collapse, slow construction, etc., to reduce disturbance and save costs , The effect of low construction cost

Active Publication Date: 2020-04-21
CENT SOUTH UNIV +1
View PDF4 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, during the construction of the shaft pilot hole through the flowing sand layer with water, there will be p

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method capable of causing pilot hole to pass through large-area drifting sand layer through shaft counter-drilling method
  • Construction method capable of causing pilot hole to pass through large-area drifting sand layer through shaft counter-drilling method

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0028] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the protection scope of the present invention.

[0029] In order to make the above objectives, features and advantages of the present invention more obvious and understandable, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0030] The invention provides a construction method for a pilot hole of a vertical shaft raise method over a large area quicksand layer, which comprises the following steps:

[00...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method capable of causing a pilot hole to pass through a large-area drifting sand layer through a shaft counter-drilling method. The construction method comprises the following steps of: a: making a construction preparation; b: installing a raise boring machine; and c: carrying out pilot hole drilling construction. In a pilot hole drilling construction process, adopted materials are conventional, and price is low, meanwhile, additionally purchased instruments are not required, little special equipment is adopted, in addition, an integral operation methodis convenient and flexible, construction expenses and machinery equipment input are reduced, engineering construction cost is greatly lowered, and construction safety is guaranteed while an economic benefit is good. An influence on the masses in a surrounding area is reduced through a convenient operation, and surrounding environment and underground water are protected since the adopted materialsare free from environmental hazard substances. The technology has high work efficiency, is high in operability, is safe and environmentally, has good quality, is easy in promotion, saves investments,increases a new option for a disposal method capable of causing the pilot hole to pass through the drifting sand layer, prompts a development of a counter-drilling expanding excavation technology, andhas a great potential social benefit.

Description

technical field [0001] The invention relates to the technical field of shaft raising method construction, in particular to a construction method in which the pilot hole of the shaft raising method is over a large area of ​​quicksand layer. Background technique [0002] In recent years, the number of tunnel construction in my country has continued to be high, and the length of tunnel construction has surpassed the number of construction. "Long, large, multiple, and deep" has become the future development trend of tunnel construction. Among them, in order to solve the ventilation problem in extra-long highway tunnels, ventilation shafts are generally installed in the middle of the tunnel. The traditional tunnel shaft construction mainly adopts the full-section excavation method from top to bottom, supplemented by drilling and blasting methods to increase the diameter of the shaft and improve the efficiency. Low, pollute the environment, and personal safety cannot be guaranteed...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D3/00E21B7/00E21B21/00E21B33/13
CPCE21B7/00E21B21/00E21B33/13E21D3/00
Inventor 王薇陈航侯义辉周旭张心源陶豪杰张燕飞刘鳌
Owner CENT SOUTH UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products