Composite TB rubber powder modified asphalt
A technology of modified asphalt and compound modification, which is applied in building components, building insulation materials, buildings, etc., can solve the problems of insufficient high-temperature anti-rutting performance, achieve good low-temperature performance, good high-temperature anti-rutting performance, and solve environmental pollution Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
preparation example Construction
[0074] The preparation method of above-mentioned composite TB rubber powder modified asphalt, this preparation method comprises the following steps:
[0075] (1) Material preparation: prepare materials according to the raw material ratio of TB rubber powder asphalt, waste carbon powder, stabilizer, and amphoteric surfactant;
[0076] (2) Pretreatment: heat the waste toner to 130-150°C, and then ultrasonically strengthen the waste toner for 0.5-1 hour under the condition of ultrasonic power of 1000-3000w;
[0077] (3) Composite modification: add the waste carbon powder after pretreatment to TB rubber powder asphalt in stages, after each addition, stir until there are no obvious particles and then continue to add, repeat until all the carbon powder is added; then in 210 Stir with a mechanical mixer for 2 to 4 hours at ~230°C, and then use a shearer to shear at a speed of 1200±50r / min for 1.5 to 2 hours to obtain composite asphalt;
[0078] (4) Inoculation: Add stabilizers and s...
Embodiment 1
[0081] A preparation method of composite TB rubber powder modified asphalt, the steps are as follows:
[0082] (1) Pretreatment: first heat the waste carbon powder to 130°C, and then use ultrasonic strengthening, the ultrasonic power is 1000w, and the radiation time is 30min;
[0083] (2) Composite modification: add 9 parts of pretreated carbon powder to 80 parts of TB rubber powder modified asphalt, first use a mechanical mixer at 220°C for 2 hours, and then use a shearer to cut at a speed of 1200r / min Cut 1.5h;
[0084] (3) Inoculation: Add 2 parts of stabilizer (a mixture of diallyl isocyanurate and diaminobenzamide, the mass ratio of the two is 1.5) and 3 parts of amphoteric surfactant (4 parts) to the composite asphalt -aminobenzothiophene), at a temperature of 160°C, stir and mix again and incubate for 3 hours, and cool to obtain composite TB rubber powder modified asphalt.
Embodiment 2
[0086] A preparation method of composite TB rubber powder modified asphalt, the steps are as follows:
[0087] (1) Pretreatment: first heat the waste carbon powder to 140°C, and then use ultrasonic strengthening, the ultrasonic power is 2000w, and the radiation time is 40min;
[0088] (2) Composite modification: Add 12 parts of pretreated carbon powder to 85 parts of TB rubber powder modified asphalt, first use a mechanical mixer at 220°C for 3 hours, and then use a shearer to cut at a speed of 1200r / min Cut 1.5h;
[0089] (3) Inoculation: Add 3 parts of stabilizer (a mixture of diallyl isocyanurate and diaminobenzamide, the mass ratio of the two is 1.2) and 4 parts of amphoteric surfactants (4 parts) to the composite asphalt -aminobenzothiophene), at a temperature of 160°C, stir and mix again and incubate for 3 hours, and cool to obtain composite TB rubber powder modified asphalt.
PUM
Property | Measurement | Unit |
---|---|---|
particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com